Question 21

Report
Export
Collapse

Which statement best describes cost center standard hierarchy?

It is a structure to which all the cost centers within a controlling area are assigned.

It is a structure to which all the cost centers within a controlling area are assigned.

It is a structure to which all cost centers of a client have to be assigned.

It is a structure to which all cost centers of a client have to be assigned.

It is a structure where all cost centers with the same currency are defined.

It is a structure where all cost centers with the same currency are defined.

It is a structure where all cost centers within the same operating concern are defined.

It is a structure where all cost centers within the same operating concern are defined.

Suggested answer: A

Explanation:

The cost center standard hierarchy in SAP S/4HANA is a mandatory structure for each controlling area, encompassing all cost centers, providing a basis for consistent reporting and data aggregation.

asked 19/11/2024
Anupam Roy
45 questions

Question 22

Report
Export
Collapse

From which tables does SAP S/4HANA select line items in costing-based Profitability Analysis reports?

Note: There are 2 correct answers to this question.

CE2XXXX

CE2XXXX

CE4XXXX_ACCT

CE4XXXX_ACCT

ACDOCA

ACDOCA

CE1XXXX

CE1XXXX

Suggested answer: A, D

Explanation:

In costing-based Profitability Analysis, line item tables CE2XXXX and CE1XXXX store relevant profitability data in SAP S/4HANA. These tables are used for reporting detailed cost and revenue allocations.

asked 19/11/2024
Cesar Castillo
43 questions

Question 23

Report
Export
Collapse

You have implemented Product Cost by Sales Order in conjunction with revenue-based results analysis in your organization.

For a particular sales order item, you have the following:

Plan revenue = 3000

Plan costs = 2000

Actual revenue = 1200

Actual costs = 1000

What data does the system calculate during results analysis?

Revenue = 1200; Cost of sales = 800; Reserve = 200

Revenue = 1200; Cost of sales = 800; Reserve = 200

Revenue = 1200; Cost of sales = 1000; Reserve = 200

Revenue = 1200; Cost of sales = 1000; Reserve = 200

Revenue = 1200; Cost of sales = 800; WIP = 200

Revenue = 1200; Cost of sales = 800; WIP = 200

Revenue = 1200; Cost of sales = 1000; WIP = 200

Revenue = 1200; Cost of sales = 1000; WIP = 200

Suggested answer: C

Explanation:

For Product Cost by Sales Order, SAP S/4HANA calculates revenue, cost of sales, and WIP based on actual data. Given the actual revenue and cost data, the system computes a WIP value to align with results analysis requirements.

asked 19/11/2024
Justin Lee Foronda
32 questions

Question 24

Report
Export
Collapse

How does the system derive the requirement type from the material master data?

Note: There are 2 correct answers to this question.

Strategy group -> planning strategy -> requirements class -> requirements type

Strategy group -> planning strategy -> requirements class -> requirements type

MRP group -> requirements class -> planning strategy -> requirements type

MRP group -> requirements class -> planning strategy -> requirements type

MRP group -> strategy group -> planning strategy -> requirements type

MRP group -> strategy group -> planning strategy -> requirements type

Strategy group -> planning strategy -> requirements type

Strategy group -> planning strategy -> requirements type

Suggested answer: C, D

Explanation:

SAP S/4HANA derives the requirement type based on the MRP or strategy group settings, allowing the system to link planning strategies to requirement types that define demand processing in Material Requirements Planning.

asked 19/11/2024
Francesco Pignalosa
37 questions

Question 25

Report
Export
Collapse

Where do you define which cost elements are used during internal order settlement?

Derivation rule

Derivation rule

Source structure

Source structure

Settlement rule

Settlement rule

Allocation structure

Allocation structure

Suggested answer: B

Explanation:

In SAP S/4HANA, the source structure determines which cost elements are utilized during internal order settlement. The source structure maps costs to specific categories for transfer to the assigned receiver.

asked 19/11/2024
Haithem Hadef
31 questions

Question 26

Report
Export
Collapse

How can you define the overhead rate in a costing sheet?

Note: There are 2 correct answers to this question.

As equivalence number

As equivalence number

As percentage rate

As percentage rate

As quantity-based surcharge

As quantity-based surcharge

As fixed value

As fixed value

Suggested answer: B, C

Explanation:

Overhead rates in a costing sheet can be defined as a percentage rate or a quantity-based surcharge. This flexibility allows companies to allocate overhead based on usage quantities or as a percentage of base costs.

asked 19/11/2024
Amil Akhundzada
43 questions

Question 27

Report
Export
Collapse

You are setting up costing-based Profitability Analysis for your organization.

What are related configuration activities?

Note: There are 3 correct answers to this question.

Enable attributed profitability analysis

Enable attributed profitability analysis

Configure account determination for COGS split

Configure account determination for COGS split

Define characteristics

Define characteristics

Assign value fields to conditions

Assign value fields to conditions

Configure summarization levels

Configure summarization levels

Suggested answer: C, D, E

Explanation:

Setting up costing-based Profitability Analysis involves defining characteristics, assigning value fields to conditions, and configuring summarization levels. These steps enable detailed reporting and segmentation of profitability data in SAP S/4HANA.

asked 19/11/2024
Babatunde Badiru
40 questions

Question 28

Report
Export
Collapse

You post a billing document for a sales order with sales order controlling.

What data flows to Profit Center Accounting?

Note: There are 2 correct answers to this question.

Order quantity

Order quantity

Payment discount

Payment discount

Revenues

Revenues

Sales deductions

Sales deductions

Suggested answer: C, D

Explanation:

In SAP S/4HANA, revenues and sales deductions are transferred to Profit Center Accounting during billing document posting. This allows companies to assess profitability by profit center accurately.

asked 19/11/2024
Ero Hiiesalu
36 questions

Question 29

Report
Export
Collapse

What do you need to set up in order to bring the values from incoming sales orders into account-based Profitability Analysis?

An extension ledger of type 'P: Line items with technical numbers / no deletion possible'

An extension ledger of type 'P: Line items with technical numbers / no deletion possible'

A multi-valuation ledger

A multi-valuation ledger

A new standard G/L ledger with exclusive usage for 'Prediction'

A new standard G/L ledger with exclusive usage for 'Prediction'

An extension ledger of type 'S: Line items with technical numbers / deletion possible'

An extension ledger of type 'S: Line items with technical numbers / deletion possible'

Suggested answer: D

Explanation:

For integrating incoming sales orders in account-based Profitability Analysis, an extension ledger of type 'S' is used in SAP S/4HANA, which enables the management of predictive entries with the option of deletion if required.

asked 19/11/2024
Marc-Antoine Meyssat
26 questions

Question 30

Report
Export
Collapse

Your enterprise has five company codes assigned to three separate operating charts of accounts.

What is the optimal way of configuring the relationship between operating concerns and controlling area?

Three operating concerns; three controlling areas

Three operating concerns; three controlling areas

One operating concern; three controlling areas

One operating concern; three controlling areas

One operating concern; five controlling areas

One operating concern; five controlling areas

One operating concern; one controlling area

One operating concern; one controlling area

Suggested answer: B

Explanation:

A single operating concern linked to multiple controlling areas is optimal for unified reporting across multiple charts of accounts, allowing each controlling area to map local requirements while sharing consolidated financial data.

asked 19/11/2024
Michele Valvason
40 questions
Total 80 questions