Scenario: A Citrix Architect has implemented two high availability pairs of MPX 5500 and MPX 11500 devices respectively with 12.0.53.13 nc version. The Citrix ADC devices are set up to handle Citrix Gateway. Load Balancing. Application Firewall, and Content Switching. The Workspacelab infrastructure is set up to be monitored with Citrix Application Delivery Management version 12.0.53.13 nc by the Workspacelab administrators. The Workspacelab team wants to implement one more pair(s) of Citrix ADC MPX 7500 devices with version 12.0.53.13 nc. The Citrix consulting team has assigned the task to implement these Citrix ADC devices in the infrastructure and set them up to be monitored and managed by Citrix ADC Management and Analytics {Citrix Application Delivery Management). The following are the requirements that were discussed during the project initiation call: Citrix Application Delivery Management should be configured to get the infrastructure information under sections such as HDX Insight, WEB Insight, and Security Insight. Configuration on the new MPX devices should be identical to that of MPX 11500 devices. Configuration changes after the deployment and initial setup should be optimized using Citrix Application Delivery Management. Citrix Application Delivery Management should be utilized to configure templates that can be utilized by the Workspacelab team in future deployments. As per the requirement from the Workspacelab team, Citrix Application Delivery Management should store the audited data for only 15 days. However, the architect is NOT able to view any Information under Analytics. What should the architect do to fix this issue?



Question 3 - 1Y0-440 discussion

Report
Export

Scenario: Based on a discussion between a Citrix Architect and a team of Workspacelab members, the MPX Logical layout for Workspacelab has been created across three (3) sites.

The requirements captured during the design discussion held for a NetScaler design project are as follows:

Two (2) pairs of NetScaler MPX appliances deployed in the DMZ and internal network.

High Availability will be accessible for each NetScaler MPX

The external NetScaler MPX appliance will be deployed in multi-arm mode.

The internal NetScaler MPX will be deployed in single-arm mode wherein it will be connected to Cisco ACI Fabric.

All three (3) Workspacelab sites: Dc, NDR and DR, will have similar NetScaler configurations and design.

How many NetScaler MPX appliances should the architect deploy at each site to meet the design requirements above?

A.
4
Answers
A.
4
B.
12
Answers
B.
12
C.
6
Answers
C.
6
D.
2
Answers
D.
2
Suggested answer: C