Scenario: A Citrix Architect has implemented two high availability pairs of MPX 5500 and MPX 11500 devices respectively with 12.0.53.13 nc version. The Citrix ADC devices are set up to handle Citrix Gateway. Load Balancing. Application Firewall, and Content Switching. The Workspacelab infrastructure is set up to be monitored with Citrix Application Delivery Management version 12.0.53.13 nc by the Workspacelab administrators. The Workspacelab team wants to implement one more pair(s) of Citrix ADC MPX 7500 devices with version 12.0.53.13 nc. The Citrix consulting team has assigned the task to implement these Citrix ADC devices in the infrastructure and set them up to be monitored and managed by Citrix ADC Management and Analytics {Citrix Application Delivery Management). The following are the requirements that were discussed during the project initiation call: Citrix Application Delivery Management should be configured to get the infrastructure information under sections such as HDX Insight, WEB Insight, and Security Insight. Configuration on the new MPX devices should be identical to that of MPX 11500 devices. Configuration changes after the deployment and initial setup should be optimized using Citrix Application Delivery Management. Citrix Application Delivery Management should be utilized to configure templates that can be utilized by the Workspacelab team in future deployments. As per the requirement from the Workspacelab team, Citrix Application Delivery Management should store the audited data for only 15 days. However, the architect is NOT able to view any Information under Analytics. What should the architect do to fix this issue?






Question 4 - 1Y0-440 discussion

Report
Export

Scenario: A Citrix Architect and a team of Workspacelab members met to discuss a NetScaler design project. They captured the following requirements from this design discussion:

A pair of NetScaler MPX appliances will be deployed in the DMZ network.

High Availability will be accessible in the NetScaler MPX in the DMZ Network.

Load balancing should be performed for the internal network services like Microsoft Exchange Client Access Services and Microsoft App-V.

The load balancing should be performed for StoreFront.

The NetScaler Gateway virtual server will be utilizing the StoreFront load-balancing virtual server.

The NetScaler Gateway virtual server and StoreFront.

The NetScaler Gateway virtual service and StoreFront and load-balancing services are publicly accessible.

The traffic for internal and external services must be isolated.

Click the Exhibit button to review the logical network diagram.

Which two design decisions are incorrect based on these requirements? (Choose two.)

A.
LB StoreFront bound to traffic Domain 0
Answers
A.
LB StoreFront bound to traffic Domain 0
B.
NetScaler Gateway VIP bound to Traffic Domain 1
Answers
B.
NetScaler Gateway VIP bound to Traffic Domain 1
C.
LB APP-V bound to Traffic Domain 1
Answers
C.
LB APP-V bound to Traffic Domain 1
D.
SNIP 192.168.20.2 bound to Traffic Domain 1
Answers
D.
SNIP 192.168.20.2 bound to Traffic Domain 1
Suggested answer: A, B