ExamGecko
Question list
Search
Search

List of questions

Search

Related questions







Scenario: A Citrix Architect has implemented two high availability pairs of MPX 5500 and MPX 11500 devices respectively with 12.0.53.13 nc version. The Citrix ADC devices are set up to handle Citrix Gateway. Load Balancing. Application Firewall, and Content Switching. The Workspacelab infrastructure is set up to be monitored with Citrix Application Delivery Management version 12.0.53.13 nc by the Workspacelab administrators. The Workspacelab team wants to implement one more pair(s) of Citrix ADC MPX 7500 devices with version 12.0.53.13 nc. The Citrix consulting team has assigned the task to implement these Citrix ADC devices in the infrastructure and set them up to be monitored and managed by Citrix ADC Management and Analytics {Citrix Application Delivery Management). The following are the requirements that were discussed during the project initiation call: Citrix Application Delivery Management should be configured to get the infrastructure information under sections such as HDX Insight, WEB Insight, and Security Insight. Configuration on the new MPX devices should be identical to that of MPX 11500 devices. Configuration changes after the deployment and initial setup should be optimized using Citrix Application Delivery Management. Citrix Application Delivery Management should be utilized to configure templates that can be utilized by the Workspacelab team in future deployments. As per the requirement from the Workspacelab team, Citrix Application Delivery Management should store the audited data for only 15 days. However, the architect is NOT able to view any Information under Analytics. What should the architect do to fix this issue?




Question 75 - 1Y0-440 discussion

Report
Export

Scenario: Based on a discussion between a Citrix Architect and a team of Workspacelab members, the MPX Logical layout for Workspacelab has been created across three (3) sites.

They captured the following requirements during the design discussion held for a Citrix ADC design project:

All three (3) Workspacelab sites (DC, NDR, and DR) will have similar Citrix ADC configurations and design.

Both external and internal Citrix ADC MPX appliances will have Global Server Load Balancing (GSLB) configured and deployed in Active/Passive mode.

GSLB should resolve both A and AAA DNS queries.

In the GSLB deployment, the NDR site will act as backup for the DC site, whereas the DR site will act as backup for the NDR site.

When the external Citrix ADC replies to DNS traffic coming in through Cisco Firepower IPS, the replies should be sent back through the same path.

On the internal Citrix ADC, both the front-end VIP and backend SNIP will be part of the same subnet.

The external Citrix ADC will act as default gateway for the backend servers.

All three (3) sites, DC, NDR, and DR, will have two (2) links to the Internet from different service providers configured in Active/Standby mode.

Which design decision must the architect make the design requirements above?

A.
MAC-based Forwarding must be enabled on the External Citrix ADC Pair.
Answers
A.
MAC-based Forwarding must be enabled on the External Citrix ADC Pair.
B.
NSIP of the External Citrix ADC must be configured as the default gateway on the backend servers.
Answers
B.
NSIP of the External Citrix ADC must be configured as the default gateway on the backend servers.
C.
The Internal Citrix ADC must be deployed in Transparent mode.
Answers
C.
The Internal Citrix ADC must be deployed in Transparent mode.
D.
The ADNS service must be configured with an IPv6 address.
Answers
D.
The ADNS service must be configured with an IPv6 address.
Suggested answer: A
asked 16/09/2024
Emanuele Facchini
30 questions
User
Your answer:
0 comments
Sorted by

Leave a comment first