Question 42 - H12-351_V1.0 discussion

Report
Export

During a project lifecycle, the______ document needs to be output after the high level design be output after the low level design is complete. (Enter the acronyms in capital letters.)

A.
ATP
Answers
A.
ATP
Suggested answer: A

Explanation:

ATP stands for Acceptance Test Plan, which is a document that needs to be output after the low level design is complete. The ATP describes the acceptance criteria and test cases for the project.

Reference: https://support.huawei.com/enterprise/en/doc/EDOC1100058940/8a8f1c9b/atp