Question 50 - CIS-SPM discussion

Report
Export

When can a user choose from multiple rate types for their work, while logging a time card?

A.
Only if the capability is enabled in the Time Sheet Policies
Answers
A.
Only if the capability is enabled in the Time Sheet Policies
B.
Only if this capability is enabled in the Project Record
Answers
B.
Only if this capability is enabled in the Project Record
C.
Only one (1) rate type can apply
Answers
C.
Only one (1) rate type can apply
D.
Only if the capability is enabled in the Project Preferences
Answers
D.
Only if the capability is enabled in the Project Preferences
Suggested answer: A

Explanation:

According to theUsing rate types and labor rate cardsdocument, a user can choose from multiple rate types for their work, while logging a time card, only if the capability is enabled in the Time Sheet Policies. This capability allows users to select different rate types for different tasks, such as standard, overtime, or travel. The other options are not correct, as they are not the places where the capability can be enabled. The Project Record is used to create and update project details, such as name, description, and state. The Project Preferences are used to set the default values for project fields, such as number, type, and priority. The option C is not correct, as more than one rate type can apply if the capability is enabled.