VMware 3V0-21.21 Practice Test - Questions Answers, Page 8
List of questions
Related questions
As part of a requirements gathering workshop, the customer provides the following requirements for the design of a new greenfield virtual infrastructure:
Some applications have a latency that must be less than 5 minutes.
The solution must be able to support a workload growth rate of 10% per year.
Which requirement classification is being gathered for the design documentation?
An architect is designing a new vSphere cluster. The requirement is to provide a total of 96 CPU cores and 1.5 TB RAM across all hosts.
The following information has been provided:
Two different physical hardware profiles are available for the ESXi hosts in the cluster.
- Profile 1: 16 CPU cores and 256 GB RAM
- Profile 2: 32 CPU cores and 512 GB RAM
Profile 2 is twice as expensive to purchase as Profile 1.
Which two aspects should the architect consider when selecting the hardware profile? (Choose two.)
During a requirements gathering workshop, the customer provides the following requirement:
A new vSphere platform must be designed securely and all interfaces must be protected against potential snooping.
How should this non-functional security requirement be documented?
An architect is designing a new backup solution for a vSphere platform that has been recently upgraded to vSphere 7.
The architect wants the backup solution to perform the following:
Full virtual machine image backup and restore
Incremental virtual machine image backup and restore
File level backup and restore within both Windows and Linux virtual machines LAN-free backup Which functional requirement should the architect include in the design of the new backup solution?
An architect is tasked with designing a new VMware software-defined data center (SDDC) solution for an online retail customer who has a primary and secondary data center as well as 10 distribution hubs.
The customer has provided the following business requirements to help inform the design:
The solution must support the running of up to 1,000 concurrent virtual machines across the primary and secondary data center.
The solution must support the running of up to 20 concurrent virtual machines in each distribution hub.
The solution must support the separation of management and lines-of-business application virtual machines.
All management components (including directory services, backup, automation, operations and logging) must be deployed to the primary data center.
All virtual infrastructure components must have redundancy of N+1.
All sites are connected to each other using a wide area network that has multiple diversely routed links.
The solution should support a monthly uptime target of 99.9%.
The recovery time objective (RTO) for the solution must be four hours.
The recovery point objective (RPO) for the solution must be 24 hours.
Given the information from the customer, which assumption should the architect include in the design?
Which of the listed requirements would be classified as a recoverability non-functional requirement?
An architect has 50 ESXi hosts to deploy and DHCP servers are not allowed on any network. Which automated host deployment method should the architect use?
A customer defines a requirement to minimize the vMotion migration time during a maintenance period. The servers being used are equipped with eight 1 GbE network adapters.
Per the defined logical network configuration, there are two network adapters each used for:
Management traffic vMotion traffic iSCSI traffic Virtual machine traffic Which design decision should the architect make to meet the customer requirement?
An architect is preparing a design for a customer. Based on requirements, the architect recommends an HCI- based infrastructure with all-flash architecture. During the assessment, it is confirmed that the network throughput generated by virtual machines does not exceed 150 Mb/s.
What is the minimum number and type of network adapters in each server that the architect can recommend to ensure requirements are met and there is no single point of failure?
An architect decides to separate virtual desktops and application servers into separate vSphere clusters to meet security and management requirements.
What are two implications of this design decision? (Choose two.)
Question