Your MRP run detects a shortage of 2000 pieces for a material with an active quota arrangement. Each of your two suppliers can only supply 1000 pieces at once. What must you maintain to have MRP generate a procurement proposal for 1000 pieces for each supplier?

Note: There are 2 correct answers to this question.

Set a maximum lot size in the quota arrangement item and select the 1x checkbox

Set a maximum lot size in the quota arrangement item and select the 1x checkbox

Assign a rounding profile in the material master record of the planned material

Assign a rounding profile in the material master record of the planned material

Assign the indicator for quota splitting to the lot-sizing procedure being used

Assign the indicator for quota splitting to the lot-sizing procedure being used

Set a maximum quola quantity in the quota arrangement item for each supplier

Set a maximum quola quantity in the quota arrangement item for each supplier

Comment (0)
Suggested answer: A, D