ExamGecko
Home Home / Nutanix / NCSC-Level-1

NCSC-Level-1: Nutanix Certified Services Consultant (NCSC): Level 1

Nutanix Certified Services Consultant (NCSC): Level 1
Vendor:

Nutanix

Nutanix Certified Services Consultant (NCSC): Level 1 Exam Questions: 78
Nutanix Certified Services Consultant (NCSC): Level 1   2.370 Learners
Take Practice Tests
Comming soon
PDF | VPLUS

The NCSC-Level-1 exam, also known as Nutanix Certified Sales Consultant (NCSC): Level 1, is a crucial certification for professionals in the field of sales and customer engagement. To increase your chances of passing, practicing with real exam questions shared by those who have succeeded can be invaluable. In this guide, we’ll provide you with practice test questions and answers, offering insights directly from candidates who have already passed the exam.

Why Use NCSC-Level-1 Practice Test?

  • Real Exam Experience: Our practice tests accurately replicate the format and difficulty of the actual NCSC-Level-1 exam, providing you with a realistic preparation experience.

  • Identify Knowledge Gaps: Practicing with these tests helps you identify areas where you need more study, allowing you to focus your efforts effectively.

  • Boost Confidence: Regular practice with exam-like questions builds your confidence and reduces test anxiety.

  • Track Your Progress: Monitor your performance over time to see your improvement and adjust your study plan accordingly.

Key Features of NCSC-Level-1 Practice Test:

  • Up-to-Date Content: Our community ensures that the questions are regularly updated to reflect the latest exam objectives and technology trends.

  • Detailed Explanations: Each question comes with detailed explanations, helping you understand the correct answers and learn from any mistakes.

  • Comprehensive Coverage: The practice tests cover all key topics of the NCSC-Level-1 exam, including Nutanix solutions, sales techniques, and customer engagement strategies.

Exam Details:

  • Exam Number: NCSC-Level-1

  • Exam Name: Nutanix Certified Sales Consultant (NCSC): Level 1

  • Length of Test: 60 minutes

  • Exam Format: Multiple-choice questions

  • Number of Questions: Approximately 50 questions

  • Passing Score: 80%

Use the member-shared NCSC-Level-1 Practice Tests to ensure you’re fully prepared for your certification exam. Start practicing today and take a significant step towards achieving your certification goals!

Related questions

After imaging the nodes and creating the cluster successfully, the consultant connects the cluster to the customer network. When logging into Prism, the events dashboard is full of errors.

What is causing the issue?

A.
The cluster was not stopped prior to connecting to the customer network.
A.
The cluster was not stopped prior to connecting to the customer network.
Answers
B.
The Cluster Virtual IP Address (VIP) was not set up during the process.
B.
The Cluster Virtual IP Address (VIP) was not set up during the process.
Answers
C.
Foundation did not create the cluster successfully.
C.
Foundation did not create the cluster successfully.
Answers
D.
The consultant did not run Nutanix Cluster Check (NCC..
D.
The consultant did not run Nutanix Cluster Check (NCC..
Answers
Suggested answer: A
asked 23/09/2024
Talal Elemam
51 questions

While trying to upgrade AOS in a cluster, a consultant receives a warning message that there are two powered-on VMs that need to be powered off for the upgrade to proceed.

What would cause this warning to be issued?

Become a Premium Member for full access
Unlock Premium Member  Unlock Premium Member

A consultant creates a Nutanix cluster using the 10.10.10.0/24 network and VLAN 10. The customer creates a VM network inside the Prism using VLAN 20. The customer starts to create VMs but is unable to ping the default gateway from these new systems.

What is causing the issue?

Become a Premium Member for full access
Unlock Premium Member  Unlock Premium Member

A consultant creates a new cluster using ESXi as the hypervisor. After creating the cluster, the consultant begins to run Life Cycle Manager (LCM) updates. During the LCM upgrade pre-checks, an error is returned.

Which configuration is causing this issue?

Become a Premium Member for full access
Unlock Premium Member  Unlock Premium Member

A consultant deploys a four-node VMware ESXi cluster and vCenter server. An HA/DRS cluster is configured for all four nodes. The customer deploys five new VMs on the cluster.

During the knowledge Transfer, a network cable on one node is removed to demonstrate HA and migration of the VMs to another host. In the HA/DRS cluster settings, the VM Restart Priority for all CVMs is set to Disabled. The customer observes warnings that the CVM on the ejected host is no longer powered on.

Which ESXi HA/DRS cluster setting is missing?

A.
Enable EVC for the cluster.
A.
Enable EVC for the cluster.
Answers
B.
Disable VM Monitoring on all CVMs.
B.
Disable VM Monitoring on all CVMs.
Answers
C.
Disable Automation Level on all CVMs.
C.
Disable Automation Level on all CVMs.
Answers
D.
Enable Host Monitoring.
D.
Enable Host Monitoring.
Answers
Suggested answer: C
asked 23/09/2024
Firew Abebe
29 questions

A consultant creates an AHV cluster and connects the Intel X550T NICs to the top of rack switch using Twinax cables. The activity and link lights are green. The cluster cannot communicate over the 10GbE link.

What is the first command the consultant should perform to troubleshoot the issue?

A.
manage_ovs show_bridges
A.
manage_ovs show_bridges
Answers
B.
manage_ovs show_interfaces
B.
manage_ovs show_interfaces
Answers
C.
manage_ovs update_uplinks
C.
manage_ovs update_uplinks
Answers
D.
manage_ovs show_uplinks
D.
manage_ovs show_uplinks
Answers
Suggested answer: A
asked 23/09/2024
Sander Verheijen
36 questions

What reference materials should be provided to the customer during the Knowledge Transfer?

A.
Questionnaire, technical slides and checklist, links to documentation and resources
A.
Questionnaire, technical slides and checklist, links to documentation and resources
Answers
B.
As-Built Guide, technical slides and checklist, Network Diagram
B.
As-Built Guide, technical slides and checklist, Network Diagram
Answers
C.
As-Built Guide, Project Plan, links to documentation and resources
C.
As-Built Guide, Project Plan, links to documentation and resources
Answers
D.
As-Built Guide, technical slides and checklist, links to documentation and resources
D.
As-Built Guide, technical slides and checklist, links to documentation and resources
Answers
Suggested answer: D
asked 23/09/2024
Sivakumar Duraimanickam
36 questions

A consultant creates three storage containers (container-1, container-2, container-3). The customer requires that only container-1, which will be utilized as an NFS datastore, be presented to external hosts.

However, users are able to mount all three containers.

What is causing this problem?

A.
Compression was turned on for all containers.
A.
Compression was turned on for all containers.
Answers
B.
A Container-level whitelist entry was configured.
B.
A Container-level whitelist entry was configured.
Answers
C.
Deduplication was turned on for all containers.
C.
Deduplication was turned on for all containers.
Answers
D.
A Global whitelist entry was configured.
D.
A Global whitelist entry was configured.
Answers
Suggested answer: D
asked 23/09/2024
Frank van Hout
37 questions

A consultant is using a customer’s switch for installation. Although the 10GbE ports for each of the hosts are connected to the switch, the nodes fail to be discovered.

What is causing the issue?

Become a Premium Member for full access
Unlock Premium Member  Unlock Premium Member

A consultant configures an ESXi cluster which will utilize a vSphere Distributed Switch (vDS). The consultant has just migrated the first host to the dvSwitch when several alerts appear within Prism Element regarding Host-to-CVM connectivity.

What is causing these alerts?

A.
The consultant migrated the CVM Backplane and VM network adapter over to the vDS.
A.
The consultant migrated the CVM Backplane and VM network adapter over to the vDS.
Answers
B.
The consultant migrated the CVM svm-iscsi-pg network adapter over to the vDS.
B.
The consultant migrated the CVM svm-iscsi-pg network adapter over to the vDS.
Answers
C.
The consultant migrated the CVM Backplane network adapter over to the vDS.
C.
The consultant migrated the CVM Backplane network adapter over to the vDS.
Answers
D.
VLAN tags are incorrectly configured on the vDS port groups.
D.
VLAN tags are incorrectly configured on the vDS port groups.
Answers
Suggested answer: C
asked 23/09/2024
MYKEL PERRY
38 questions