A Discrete manufacturing company produces speakers. The high-end speaker model uses protective rubber strips on the edges.

Approximately five inches of rubber is consistently scrapped in the production process, regardless of production quantity. Workers manually consume the extra material on the picking list or scrap it in an inventory journal.

You need configure the system to automatically account for this scrap on the Bill of materials (BOM).

What should you do?

A.

Increase the required quantity of the rubber component by five on the BOM

Answers
A.

Increase the required quantity of the rubber component by five on the BOM

B.

Set a variable scrap of five percent for the rubber BOM line

Answers
B.

Set a variable scrap of five percent for the rubber BOM line

C.

Add an additional BOM line for five inches and set consumption to Variable

Answers
C.

Add an additional BOM line for five inches and set consumption to Variable

D.

Set a Constant scrap of five on the BOM line for rubber

Answers
D.

Set a Constant scrap of five on the BOM line for rubber

Suggested answer: D

Explanation:

References: https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-information-used-in-bom-calculations-with-standard-costs

asked 05/10/2024
Alice Smith
39 questions
User
Your answer:
0 comments
Sorted by

Leave a comment first