List of questions
Related questions
Question 15 - D-PSC-MN-01 discussion
A platform engineer is connecting a new Dell PowerScale F600 node to the frontend switch in an existing cluster with legacy nodes.
How should the network cables be connected?
A.
From the PCIe slot 1 to the frontend Ethernet switch
B.
From the PCIe slot 3 to the frontend Ethernet switch
C.
From the PCIe slot 1 to the frontend InfiniBand switch
D.
From the PCIe slot 3 to the frontend InfiniBand switch
Your answer:
0 comments
Sorted by
Leave a comment first