What are the required settings when using terminal emulation software to connect to a Dell EMC PowerScale Gen 5 node?
Transfer Rate = 57.600, Data Bits = 8, Parity = 1, Stop Bits = 0, Flow Control = Software
Transfer Rate = 115.200, Data Bits = 8, Parity = None, Stop Bits = 1, Flow Control = Hardware
Transfer Rate = 57.600, Data Bits = 7, Parity = 1, Stop Bits = 8, Flow Control = Hardware
Transfer Rate = 115.200, Data Bits = 7, Parity = 1, Stop Bits = 1, Flow Control = Software
A platform engineer is creating a Dell PowerScale cluster that must meet SEC 17a-4f rules. Node 1 is powered on and cabled.
What action must be taken to meet the requirement?
Create a cluster.
Reboot into SmartLock Compliance mode.
Activate the Enterprise Security mode license.
Call Dell Tech Support to configure the cluster manually.
A customer wants to add SSDs to the drive sleds in a Dell PowerScale H600 node for higher storage performance. What should the platform engineer tell the customer?
Cache expansion requires a Dell Professional Services engagement.
Hybrid node SSDs in identical sled locations can be used for either cache or primary storage.
Only F series nodes can use SSDs for primary storage.
Each sled must have an equal number of SSDs.
A customer received replacement parts from Dell without prior communication.
Why did they receive the replacement parts?
The cluster is configured with Secure Remote Services only.
The cluster is enrolled in the AutoCRU program.
The cluster is configured with SCG.
The cluster is configured with SupportAssist only.
What is a consideration when reimaging a Dell PowerScale node?
Perform on a node mat is not a member of a cluster.
Reimaging does not erase the data and is faster.
Perform on a node that Is a member of a cluster.
Use the rolling reimage update to retain the current OneFS version.
Which cable is required to connect to the A300 console?
RJ45
DB9-to-DB9
VGA
USB-to-USB
A customer has a Dell EMC PowerScale cluster. The IT manager asks a platform engineer if WORM directories can be overwritten.
Only compliance and secure SmartLock directories need to be reformatted.
Only enterprise SmartLock directories need to be reformatted.
Only enterprise and compliance SmartLock directories need to be reformatted.
Enterprise, compliance, and secure SmartLock directories need to be reformatted.
A platform engineer has created a cluster of 8 F200 nodes. A requirement is for each power supply on each node to supply power to the respective node equally.
What must the platform engineer do to meet the requirement?
Run the isi config and change the settings in the config subsystem
Cable each node power connection to a different PDU in the rack
Use the iDRAC settings on each node to disable the hot spare feature
Run the isi set -n command to change the power supply behavior
A platform engineer has added an F200 node to a Dell EMC PowerScale cluster. The cluster now has five F200 nodes.
Before leaving the site, what action must the engineer perform?
Verify the node LNN is set to 1
SmartFail the node and rejoin the cluster
Reboot the node and wait for a green status
Ensure the install base record is updated
What should the platform engineer pre-check when installing Dell EMC PowerScale Gen 6 nodes in a customer-provided rack?
PDUs are located on opposite sides of the rack
Rack is leveled using the front legs first and the rear legs second
Rack has full earth ground and is properly bolted to the floor
Rack has a minimum of two PDUs