Windows clients cannot connect using the fully qualified domain name when testing the connectivity of a newly created cluster. What connection test identifies the problem?
DNS
NFS Mount
Mapping a Windows drive
WebUI using IP address
An engineer runs ini_reformat_node command.
What are they attempting to do?
Reformat the mirrored FEC data.
Reformat a node quickly to repurpose a node.
Reformat the mirrored journals.
Reformat a node to securely erase all data.
An existing PowerScale cluster consists of four A300 and three F600 nodes.
What is the minimum number of nodes an engineer can add to expand both node pools?
txA300 2xF600
2xA300 2xF600
3xF600 4xA300
2xA300 1x F600
What type of upgrade on a Dell PowerScale cluster requires the least amount of time?
Simultaneous
Parallel
Rolling
Automatic
Refer to the exhibit.
An engineer replaced the drive in C1. They run the isi devices drive list command and obtain the output that is shown.
What action must the engineer take?
Run the 1 = 1 devices drive add c1 command.
Run the isi devices drive format C1 command.
Contact Dell support.
Update the drive firmware.
What is the isi diagnostics gather command used for?
Diagnose the CPU.
Diagnose the TPM
Gather performance data.
Gather cluster logs
Which model is a part of the Isilon Gen6 platform?
F600
F810
F900
F200
What is done with the components when a Gen6 single node is replaced?
Transferred to the new node
Returned to Dell
Sent to WWFA
What does a terracotta colored handle indicate on Dell PowerScale Gen6 hardware?
The FRU must be replaced.
The node can remain online when replacing a hardware component.
The node must be shut down for maintenance procedures.
The component must not be removed while hardware is online.
Question