ExamGecko
Question list
Search
Search

List of questions

Search

Question 47 - D-PSC-MN-01 discussion

Report
Export

An engineer wants to create a 4-node cluster after rack and stack.

What port must they use to start the installation?

A.

COM

Answers
A.

COM

B.

FE

Answers
B.

FE

C.

BE

Answers
C.

BE

D.

iDRAC

Answers
D.

iDRAC

Suggested answer: D

Explanation:

When an engineer wants to create a 4-node cluster after rack and stack, they must use the iDRAC (Integrated Dell Remote Access Controller) port to start the installation.

Understanding iDRAC:

Remote Management:

iDRAC provides out-of-band management capabilities, allowing administrators to manage and monitor nodes remotely.

Virtual Console Access:

Offers a virtual console for accessing the node's BIOS and performing installations.

Initial Cluster Setup with iDRAC:

Accessing the Node:

Connect to each node's iDRAC interface using its IP address.

Starting the Installation:

Use the iDRAC virtual console to interact with the node as if you were physically present.

Benefits:

No need for physical access to the COM port or direct console connections.

Allows for remote configuration and reduces the time required for setup.

Why iDRAC is Used Over Other Ports:

COM Port:

The COM (serial) port can be used for initial setup, but it requires physical access and serial cables.

Less convenient compared to iDRAC's remote capabilities.

FE (Front-End) and BE (Back-End) Ports:

FE and BE ports are used for data network connections, not for initial setup or management.

The initial configuration cannot be performed through these ports.

Procedure for Using iDRAC:

Step 1: Connect to iDRAC

Ensure that iDRAC network interfaces are connected and configured with IP addresses.

Access iDRAC via a web browser using the IP address.

Step 2: Launch Virtual Console

Log in to the iDRAC interface.

Launch the virtual console to access the node's system interface.

Step 3: Perform Initial Configuration

Use the virtual console to run the OneFS installation wizard.

Configure cluster settings, networking, and other parameters.

Dell PowerScale Best Practices:

Using iDRAC for Installation:

Recommended for its convenience and efficiency.

Allows for consistent setup procedures across multiple nodes.

Network Preparation:

Ensure iDRAC interfaces are properly connected to the management network.

Verify network settings to allow access from the engineer's workstation.

Dell PowerScale

Reference:

Dell EMC PowerScale OneFS Installation Guide:

Provides detailed steps on installing OneFS using iDRAC.

Dell EMC PowerScale Networking Guide:

Discusses management network configurations, including iDRAC setup.

Dell EMC iDRAC User's Guide:

Offers comprehensive information on using iDRAC features.

Knowledge Base Articles:

Article ID 000125678: 'Initial Cluster Configuration Using iDRAC'

Article ID 000125679: 'Best Practices for Remote Installation on PowerScale Nodes'

asked 29/10/2024
Olusola Adebayo
44 questions
User
Your answer:
0 comments
Sorted by

Leave a comment first