ExamGecko
Question list
Search
Search

List of questions

Search

Question 86 - D-PSC-MN-01 discussion

Report
Export

A platform engineer is following the drive replacement procedure for a Dell EMC PowerScale Gen 6 node. One of the steps is the removal of the sled containing the target drive.

What is the maximum time a sled can be removed from its slot before all drives in that sled are SmartFailed automatically?

A.

10 minutes

Answers
A.

10 minutes

B.

15 minutes

Answers
B.

15 minutes

C.

20 minutes

Answers
C.

20 minutes

D.

50 minutes

Answers
D.

50 minutes

Suggested answer: B

Explanation:

When performing drive replacements on a Dell EMC PowerScale Gen 6 node, it's crucial to adhere to specific time constraints to prevent unintended system behaviors.

Maximum Time Before Automatic SmartFail:

15 Minutes: If a drive sled is removed from its slot for more than 15 minutes, OneFS will automatically initiate a SmartFail process for all drives in that sled.

This time limit ensures data integrity by triggering data protection mechanisms if a drive is presumed lost.

Procedure Details:

Drive Sled Removal:

Carefully remove the sled containing the target drive.

Ensure that you have the replacement drive ready to minimize downtime.

Time Management:

Keep the sled out of the chassis for no more than 15 minutes.

Plan the replacement procedure to stay well within this time frame.

Consequences of Exceeding Time Limit:

Exceeding 15 minutes causes the system to treat the drives as failed.

The SmartFail process begins, impacting system performance and prolonging maintenance.

Dell PowerScale

Reference:

Dell EMC PowerScale Hardware Replacement Guide:

Section on Drive Replacement Procedures:

Specifies the 15-minute time limit for drive sled removal.

Emphasizes the importance of adhering to this limit to prevent unintended SmartFails.

Best Practices:

Preparation:

Have all necessary tools and replacement drives ready before starting.

Monitoring:

Use a timer to ensure the sled is reinserted within the allotted time.

Post-Replacement:

Verify the new drive is recognized and the cluster health is optimal.

asked 29/10/2024
Rodwell Shibambu
51 questions
User
Your answer:
0 comments
Sorted by

Leave a comment first