Question 7 - D-PEXE-IN-A-00 discussion

Report
Export

A deployment engineer arrives on-site to install an XE9680 server. The server lift does not have the ability to maneuver beneath the XE9680 shipping pallet.

How many people must you have to physically pick up the server to place it on the lift shelf?

A.
4. The server is heavy, and the lift shelf does not rest on the floor.
Answers
A.
4. The server is heavy, and the lift shelf does not rest on the floor.
B.
3. Two people are needed to tilt the server while the third person slides the shelf beneath the server.
Answers
B.
3. Two people are needed to tilt the server while the third person slides the shelf beneath the server.
C.
2. At least one person on each side is needed to pick up the server and place on the lift.
Answers
C.
2. At least one person on each side is needed to pick up the server and place on the lift.
D.
1. They can tilt the server and slide the lift underneath.
Answers
D.
1. They can tilt the server and slide the lift underneath.
Suggested answer: A

Explanation:

Weight and Size of the PowerEdge XE9680:

The Dell PowerEdge XE9680 server is designed for high performance, which often results in a larger and heavier form factor. Handling such servers typically requires multiple people to ensure safety and prevent damage.

Ergonomic Considerations:

Due to its weight and size, it is crucial to follow proper ergonomic practices when lifting and moving the server. This minimizes the risk of injury and ensures the server is handled safely.

Number of People Required:

For the XE9680, it is recommended to have four people when physically picking up the server to place it on the lift shelf. This recommendation is based on the server's weight and the need to maneuver it safely onto the lift.

Safety and Coordination:

Each person should position themselves on one side of the server, ensuring an even distribution of weight. This coordinated effort helps in lifting the server evenly and reducing the risk of dropping or mishandling it.

Procedure for Lifting:

Two individuals should position themselves at the front corners, and two at the rear corners of the server. On a coordinated count, all four should lift the server together and place it gently onto the lift shelf.

The lift shelf should be stable and able to support the weight of the server once it is placed on it.

Using the Lift:

Once the server is on the lift shelf, it can be maneuvered into the desired position in the rack. Ensure that the lift is rated for the weight of the XE9680 to avoid any mechanical failures.

Reference to Official Documentation:

Dell's installation guides and service manuals typically provide guidelines on the number of personnel required for handling large and heavy servers, ensuring both safety and compliance with best practices.

Dell EMC PowerEdge XE9680 Installation and Service Manual: This manual provides detailed guidelines on handling and installing the XE9680 server, including the recommended number of personnel required for safe handling.

Dell EMC Technical Specifications Guide: Offers insights into the physical dimensions and weight of the PowerEdge XE9680, informing the need for multiple personnel for safe handling and installation.