A deployment engineer is preparing to install three PowerEdge XE9680 servers in a rack supplied by the customer.
What must they before going on-site to install the servers?
A.
The rack can accommodate the length of the servers.
B.
The customer completed the required training on the server.
C.
The rack will have a top-of-rack switch.
D.
The rack has at least six PDUs and two power sources.