Cisco 800-150 Practice Test - Questions Answers, Page 6

List of questions
Question 51

[Cisco Equipment and Related Hardware]
Which two features are managed by the hardware and software of the collaboration infrastructure? (Choose two.)
Question 52

DRAG DROP
[Maintenance and RMA Procedures]
Drag and drop the actions that must be taken after installing an E-Series server from the left into order on the right.
Question 53

DRAG DROP
[Safety and Electrostatic Discharge (ESD) Precautions]
Drag and drop the safety actions that must be taken prior to beginning work into order on the right for working with electrical equipment.
Question 54

[Maintenance and RMA Procedures]
Which component of the Cisco Room system requires removal of the upper textile grille and the use of release levers during its replacement process?
Question 55

[Cisco Equipment and Related Hardware]
What are two indicators that a network interface card must be replaced? (Choose two.)
Question 56

[Maintenance and RMA Procedures]
Which step must be performed immediately after disconnecting the network cable when replacing an SFP transceiver module?
Question 57

[Cisco Equipment and Related Hardware]
How must the power to a system with dual power supplies on a Cisco Nexus switch be connected?
Question 58

[Maintenance and RMA Procedures]
What happens to the switch operation when a supervisor module in a Cisco Nexus switch is replaced by two supervisor modules?
Question 59

[Maintenance and RMA Procedures]
What does OIR stand for in the context of Cisco ASR component replacement?
Question 60

DRAG DROP
[Cisco Equipment and Related Hardware]
Refer to the exhibit. Drag and drop the names of the field-replaceable units from the left onto the corresponding letters on the image of the Cisco Catalyst 9400 modular switch.
Question