SAP C_TS452_2410 Practice Test - Questions Answers

Add to Whishlist

List of questions

Question 1

Report Export Collapse

Your MRP run detects a shortage of 2000 pieces for a material with an active quota arrangement. Each of your two suppliers can only supply 1000 pieces at once. What must you maintain to have MRP generate a procurement proposal for 1000 pieces for each supplier?

Note: There are 2 correct answers to this question.

Set a maximum lot size in the quota arrangement item and select the 1x checkbox

Set a maximum lot size in the quota arrangement item and select the 1x checkbox

Assign a rounding profile in the material master record of the planned material

Assign a rounding profile in the material master record of the planned material

Assign the indicator for quota splitting to the lot-sizing procedure being used

Assign the indicator for quota splitting to the lot-sizing procedure being used

Set a maximum quola quantity in the quota arrangement item for each supplier

Set a maximum quola quantity in the quota arrangement item for each supplier

Suggested answer: A, D
asked 11/03/2025
Sander de Beus
42 questions

Question 2

Report Export Collapse

Which of the following SAP Fiori apps must you use to set up the following Situation Handling use case: Quantity Deficit in Supplier's Delivery? Note: There are 2 correct answers to this question.

Manage Situation Types

Manage Situation Types

Manage Teams and Responsibilities

Manage Teams and Responsibilities

Manage Situation Objects

Manage Situation Objects

Monitor Situations

Monitor Situations

Suggested answer: A, D
asked 11/03/2025
Olive Wang
45 questions

Question 3

Report Export Collapse

Which of the following can you control with the confirmation control key? Note: There are 2 correct answers to this question.

Whether a goods receipt needs to be confirmed

Whether a goods receipt needs to be confirmed

Whether reminders for outstanding confirmations are required

Whether reminders for outstanding confirmations are required

Whether a confirmation type is relevant for MRP

Whether a confirmation type is relevant for MRP

Whether a confirmation type is a prerequisite for a goods receipt

Whether a confirmation type is a prerequisite for a goods receipt

Suggested answer: A, D
asked 11/03/2025
Luca Arcuri
36 questions

Question 4

Report Export Collapse

How can you completely block a material for procurement in a plant? Note: There are 2 correct answers to this question.

Create a blocking entry in the supplier master record

Create a blocking entry in the supplier master record

Create a quota arrangement entry with a quantity of zero

Create a quota arrangement entry with a quantity of zero

Use a relevant plant-specific material status in the material master

Use a relevant plant-specific material status in the material master

Create an entry in the source list with a blocking indicator and NO supplier

Create an entry in the source list with a blocking indicator and NO supplier

Suggested answer: C, D
asked 11/03/2025
Martin Ojeda Knapp
30 questions

Question 5

Report Export Collapse

Where can you enter a rounding profile?

Note: There are 2 correct answers to this question.

Lot-sizing procedure

Lot-sizing procedure

Purchasing info record

Purchasing info record

Source list

Source list

Material master

Material master

Suggested answer: B, D
asked 11/03/2025
Oliver Lüthi
47 questions

Question 6

Report Export Collapse

What is the definition of an opening horizon?

The time available for the MRP run to convert a requirement into a schedule line or a planned order

The time available for the MRP run to convert a requirement into a schedule line or a planned order

The time available for the MRP run to convert requirements into purchase requisitions or planned orders

The time available for the MRP run to convert requirements into purchase requisitions or planned orders

The time available for the MRP controller to convert a purchase requisition into a purchase order or a schedule line

The time available for the MRP controller to convert a purchase requisition into a purchase order or a schedule line

The time available for the MRP controller to convert a planned order into a purchase requisition or a production order

The time available for the MRP controller to convert a planned order into a purchase requisition or a production order

Suggested answer: D
asked 11/03/2025
Arndt Langer
48 questions

Question 7

Report Export Collapse

Which of the following procurement proposals can be created during an MRP Live planning run for externally procured materials? Note: There are 2 correct answers to this question.

Planned order

Planned order

Purchase order

Purchase order

Delivery schedule line

Delivery schedule line

Purchase requisition

Purchase requisition

Suggested answer: C, D
asked 11/03/2025
Vo Quoc Bao
42 questions

Question 8

Report Export Collapse

Which of the following tasks does the system perform during reorder point planning? Note: There are 2 correct answers to this question.

Flag materials that have been subject to an activity relevant to MRP

Flag materials that have been subject to an activity relevant to MRP

Carry out a lot-size calculation for every material with net requirements

Carry out a lot-size calculation for every material with net requirements

Carry out a net requirement calculation for every material included in the planning run

Carry out a net requirement calculation for every material included in the planning run

Perform backward scheduling to determine the availability dates of purchase requisitions

Perform backward scheduling to determine the availability dates of purchase requisitions

Suggested answer: B, C
asked 11/03/2025
Minh Phan
33 questions

Question 9

Report Export Collapse

What does SAP S/4HANA use to determine the sequence in which materials are planned?

Source list

Source list

MRP group

MRP group

Low-level code

Low-level code

Quota arrangement

Quota arrangement

Suggested answer: C
asked 11/03/2025
So young Jang
33 questions

Question 10

Report Export Collapse

Which of the following does the material type control? Note: There are 3 correct answers to this question.

Procurement type of a material

Procurement type of a material

Batch requirement for a material

Batch requirement for a material

Material number assignment

Material number assignment

Field selection in the material master

Field selection in the material master

Material availability check

Material availability check

Suggested answer: A, C, D
asked 11/03/2025
Herlinda Cantu
48 questions
Total 80 questions