The H12-425_V2.0 exam, also known as Huawei Certified ICT Professional - Data Center Facility Deployment V2.0, is a crucial certification for professionals in the field of data center facility deployment. To increase your chances of passing, practicing with real exam questions shared by those who have succeeded can be invaluable. In this guide, we’ll provide you with practice test questions and answers, offering insights directly from candidates who have already passed the exam.

Why Use H12-425_V2.0 Practice Test?

  • Real Exam Experience: Our practice tests accurately replicate the format and difficulty of the actual H12-425_V2.0 exam, providing you with a realistic preparation experience.

  • Identify Knowledge Gaps: Practicing with these tests helps you identify areas where you need more study, allowing you to focus your efforts effectively.

  • Boost Confidence: Regular practice with exam-like questions builds your confidence and reduces test anxiety.

  • Track Your Progress: Monitor your performance over time to see your improvement and adjust your study plan accordingly.

Key Features of H12-425_V2.0 Practice Test:

  • Up-to-Date Content: Our community ensures that the questions are regularly updated to reflect the latest exam objectives and technology trends.

  • Detailed Explanations: Each question comes with detailed explanations, helping you understand the correct answers and learn from any mistakes.

  • Comprehensive Coverage: The practice tests cover all key topics of the H12-425_V2.0 exam, including data center infrastructure, power supply and distribution, and cooling systems.

Exam Details:

  • Exam Number: H12-425_V2.0

  • Exam Name: Huawei Certified ICT Professional - Data Center Facility Deployment V2.0

  • Length of Test: 90 minutes

  • Exam Format: Multiple-choice questions

  • Number of Questions: Approximately 60 questions

  • Passing Score: 60% (600/1000)

Use the member-shared H12-425_V2.0 Practice Tests to ensure you’re fully prepared for your certification exam. Start practicing today and take a significant step towards achieving your certification goals!

Related questions

Which of the following menus can be used by engineers to manually add devices on the NetEco?

A.
Data center planning
A.
Data center planning
Answers
B.
Report management
B.
Report management
Answers
C.
Alarm management
C.
Alarm management
Answers
D.
System management
D.
System management
Answers
Suggested answer: D
asked 18/09/2024
Dewi Fitriyani
52 questions

Which of the following actions may be triggered after the high liquid level float of a Huawei chilled water precision air conditioner floats longer than the specified duration?

A.
The air conditioner shuts down.
A.
The air conditioner shuts down.
Answers
B.
One water pump starts.
B.
One water pump starts.
Answers
C.
A drainage exception alarm is generated.
C.
A drainage exception alarm is generated.
Answers
D.
One water pump shuts down.
D.
One water pump shuts down.
Answers
Suggested answer: C
asked 18/09/2024
Sathish M
48 questions

In operant conditioning, the subject is free to make responses at any time, So conditioning is measured by the rate of responding. In most other Ways, however, their forms of learning are essentially the same.

A.
When UPSs are connected in parallel, connect loads to the pL terminal.
A.
When UPSs are connected in parallel, connect loads to the pL terminal.
Answers
B.
When a single UPS works and loads are of the same importance, connect all loads to the sL terminal.
B.
When a single UPS works and loads are of the same importance, connect all loads to the sL terminal.
Answers
C.
When a single UPS works and loads are divided into two levels, connect the primary load to the sL terminal and the secondary load to the pl_ terminal.
C.
When a single UPS works and loads are divided into two levels, connect the primary load to the sL terminal and the secondary load to the pl_ terminal.
Answers
D.
When the UPS is overloaded, the loads connected to the sL terminal will be powered off first to ensure continuous power supply to the loads connected to the pj_ terminal.
D.
When the UPS is overloaded, the loads connected to the sL terminal will be powered off first to ensure continuous power supply to the loads connected to the pj_ terminal.
Answers
Suggested answer: D
asked 18/09/2024
Abheesh Vijayan
24 questions

To determine whether the R410A refrigerant meets requirements, compare the internal pressure of the refrigerant with the saturation pressure corresponding to the refrigerant temperature. If the difference between the internal pressure and the saturation pressure is within the range of which of the following, replace the refrigerant?

A.
0-0.05 MPa
A.
0-0.05 MPa
Answers
B.
0.05-0.1 MPa
B.
0.05-0.1 MPa
Answers
C.
0.1-0.2 MPa
C.
0.1-0.2 MPa
Answers
D.
0.25-0.3 MPa
D.
0.25-0.3 MPa
Answers
Suggested answer: B
asked 18/09/2024
Serhan Azdiken
42 questions

To modify the FusionModule2000 plan view of the ECC800-Pro, users need to log in to the WebUI as admin account.

A.
True
A.
True
Answers
B.
False
B.
False
Answers
Suggested answer: A
asked 18/09/2024
james campbell
38 questions

If multiple SmartLi battery cabinets are combined, press and hold the POWER ON/OFF button on each battery management module for more than 2s, and then switch on the battery circuit breaker in any cabinet to start all battery cabinets.

A.
True
A.
True
Answers
B.
False
B.
False
Answers
Suggested answer: A
asked 18/09/2024
Kurt Van Rymenant
44 questions

On the ECC800-Pro WebUI, which of the following is the first-level menu of the NMS Application?

A.
System Settings
A.
System Settings
Answers
B.
Maintenance
B.
Maintenance
Answers
C.
Home
C.
Home
Answers
D.
Monitoring
D.
Monitoring
Answers
Suggested answer: A
asked 18/09/2024
Yuriy Kitsis
35 questions

When connecting chilled water pipes for the NetCol8000-C, fill water and preserve pressure 8 hours after the conversion adapter is connected.

A.
True
A.
True
Answers
B.
False
B.
False
Answers
Suggested answer: B
asked 18/09/2024
Hector Moreno
40 questions

In large-scale data centers such as financial securities centers and telecom hubs. UPSs with a capacity of 200 kVA or higher are usually used. For UPS5000-E-200k, 12 V battery packs are usually configured as backup power instead of battery racks.

Become a Premium Member for full access
Unlock Premium Member  Unlock Premium Member

Which of the following statements about the functions of the AC PDB is false?

A.
Supplies power to air conditioners.
A.
Supplies power to air conditioners.
Answers
B.
Supplies power to fans.
B.
Supplies power to fans.
Answers
C.
Supplies power to the extinguishant control panel.
C.
Supplies power to the extinguishant control panel.
Answers
D.
Supplies power to sockets in the modules.
D.
Supplies power to sockets in the modules.
Answers
Suggested answer: D
asked 18/09/2024
John Russell
23 questions