A Lean Principle that addresses efficiency by the process worker is called ____________________?
While management of a company must set the stage for all improvement efforts, which of these 5S's is primarily driven by management?
As part of a Visual Factory plan __________ cards are created and utilized to identify areas in need of cleaning and organization.
The use of Kanbans work best with pull systems for determining the timing of which products or services are produced.
When a Belt applies the practice of Poka-Yoke to a project challenge she is attempting to make certain the activity is _______________ .
The Lean Principle action in the 5S approach that deals with having those items needed regularly at hand and those items need less regularly stored out of the way is known as ___________.
SPC on the outputs is more preferred than SPC on the inputs when implementing SPC for your process.
Significant variation in process performance is a consequence of several causes that can be classified using which of the terminologies shown. (Note: There are 2 correct answers).
When it comes to Control one of the most effective means of eliminating defects is to _________________ .
A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.