Refer to the exhibit.

An administrator logged into Prism Element, notices the following in the home dashboard, and showing the exhibit.

Which action should the administrator take next?

A.
Configure the fqdn for the hosts indicated
A.
Configure the fqdn for the hosts indicated
Answers
B.
Troubleshoot the zookeeper server issue
B.
Troubleshoot the zookeeper server issue
Answers
C.
Re-run NCC specifying data_resiliency_check
C.
Re-run NCC specifying data_resiliency_check
Answers
D.
Check the hardware page for disk failures
D.
Check the hardware page for disk failures
Answers
Suggested answer: C

The networking team makes changes to the Top of Rack switches to which the Nutanix cluster are attached. A few VMs are able to communicate with each other on the same node but are unable to connect to other parts of the network.

What is the likely cause of this issue?

A.
There is a VLAN misconfiguration on the VMs.
A.
There is a VLAN misconfiguration on the VMs.
Answers
B.
The vNIC port is disconnected on the affected VMs.
B.
The vNIC port is disconnected on the affected VMs.
Answers
C.
There is a VLAN misconfiguration on the switch.
C.
There is a VLAN misconfiguration on the switch.
Answers
D.
Jumbo Frame are misconfigured across ports.
D.
Jumbo Frame are misconfigured across ports.
Answers
Suggested answer: C

An administrator has a 32-node hybrid cluster with CPU, RAM and storage utilization of 80%. A database VM is configured with VM Flash.

What is causing this IO latency?

A.
Controller VM is experiencing high CPU ready time.
A.
Controller VM is experiencing high CPU ready time.
Answers
B.
Curator scans causes by ILM constantly moving data.
B.
Curator scans causes by ILM constantly moving data.
Answers
C.
VM Flash Mode reduces SSD tier capacity for VMs.
C.
VM Flash Mode reduces SSD tier capacity for VMs.
Answers
D.
Database VM is experiencing high CPU ready time.
D.
Database VM is experiencing high CPU ready time.
Answers
Suggested answer: A

An administrator is deploying a new application to a Nutanix Enterprise Cloud. The application requires a security to prevent unauthorized access. The application also uses many non-standard ports that are unique to it. Security should not be changed for existing applications.

What should the administrator do to meet these requirement?

A.
Use existing categories for the VMs. and create new security policies to use the existing categories.
A.
Use existing categories for the VMs. and create new security policies to use the existing categories.
Answers
B.
Use existing categories for the VMs and modify existing security policies to include the specific port.
B.
Use existing categories for the VMs and modify existing security policies to include the specific port.
Answers
C.
Create new categories for the VMs, and create new security policies that include the new categories.
C.
Create new categories for the VMs, and create new security policies that include the new categories.
Answers
D.
Create new categories for the VMs, and modify existing security policies to include the new categories.
D.
Create new categories for the VMs, and modify existing security policies to include the new categories.
Answers
Suggested answer: C

A CEO asks the IT administrator to provide a list of required resources to protect current workloads and the two new SQL servers from a disaster. The Nutanix environment is managed by Prism Central.

Which option explains how to meet the CEO's request?

A.
In Capacity Runway, select Optimize Resources and select all VMs that must be protected.
A.
In Capacity Runway, select Optimize Resources and select all VMs that must be protected.
Answers
B.
Create a new project and assign the VMs to it to get compute and storage requirements.
B.
Create a new project and assign the VMs to it to get compute and storage requirements.
Answers
C.
Create a new scenario based on a new cluster based on a VM Profile and select Recommend.
C.
Create a new scenario based on a new cluster based on a VM Profile and select Recommend.
Answers
D.
Create a new Recovery policy by selecting the VM that needs to be protected and get hardware requirements.
D.
Create a new Recovery policy by selecting the VM that needs to be protected and get hardware requirements.
Answers
Suggested answer: D

An administrator is trying to correct high cluster IOPs and Cluster Controller Latency. Networking is the suspected issue.

Which networking parameters should be configured in the Nutanix cluster?

A.
Bond State and network latency
A.
Bond State and network latency
Answers
B.
Number of NICs connected and network latency.
B.
Number of NICs connected and network latency.
Answers
C.
Number of NICs connected and frame size
C.
Number of NICs connected and frame size
Answers
D.
Number of NICs connected and bond state.
D.
Number of NICs connected and bond state.
Answers
Suggested answer: C

An administrator needs to configure snapshots for DR scenarios. The databases get refreshed on Friday nights regularly. The search service application re-indexes the new application on Saturday nights regularly. The remaining front-end and middle tier VMs are static but do get minor version updates weekly.

The administrator needs to have 2 weeks of daily snapshots for all the VMs in an app group and 2 weeks application consist local snapshots only on Fridays, Saturdays and Sundays on the same group of VMs.

Which two options should the administrator use to configure snapshots?

A.
Create a schedule in a protection domain for all applicable VMs to snap daily with application consistency enabled with 6 days of retention and with no application consistency and 14 days local retention.
A.
Create a schedule in a protection domain for all applicable VMs to snap daily with application consistency enabled with 6 days of retention and with no application consistency and 14 days local retention.
Answers
B.
Create two consistency groups in a protection domain, one for front-end and middle tier apps with no application consistency, one for database and Search apps with application consistency, and apply the correct schedule to both groups.
B.
Create two consistency groups in a protection domain, one for front-end and middle tier apps with no application consistency, one for database and Search apps with application consistency, and apply the correct schedule to both groups.
Answers
C.
Create one protection domain for all VMs in an application group with scheduled daily nonapplication consistent snapshots and another protection domain for all VMs in an application group with scheduled Friday. Saturday, Sunday application consistent snapshots.
C.
Create one protection domain for all VMs in an application group with scheduled daily nonapplication consistent snapshots and another protection domain for all VMs in an application group with scheduled Friday. Saturday, Sunday application consistent snapshots.
Answers
Suggested answer: A

An administrator needs to install prism central for their 2550 multi-cluster environment.

How should they deploy the application?

A.
Deploy a large 3-VM Prism Central instance
A.
Deploy a large 3-VM Prism Central instance
Answers
B.
Deploy a large 1-VM Prism Central instance.
B.
Deploy a large 1-VM Prism Central instance.
Answers
C.
Deploy a small 3-VM Prism Central instance.
C.
Deploy a small 3-VM Prism Central instance.
Answers
D.
Deploy a small 1-VM Prism Central instance.
D.
Deploy a small 1-VM Prism Central instance.
Answers
Suggested answer: A

An administrator recently added in 3 nodes to an existing 5 node cluster. While 1 node came with its own block, the other 2 nodes where added to an existing share. After adding the nodes, the administrator sees that the hardware tab displays the correct number of nodes, but incorrect position in the diagram tab.

What should the administrator do to resolve the issue?

A.
Check the factory_config.json for all 3 nodes
A.
Check the factory_config.json for all 3 nodes
Answers
B.
SSH into CVM and perform genesis restart on each CVM
B.
SSH into CVM and perform genesis restart on each CVM
Answers
C.
SSH into the CVMs and run genesis acropolis stop; cluster start
C.
SSH into the CVMs and run genesis acropolis stop; cluster start
Answers
D.
Check the factory_config. json for the two single nodes.
D.
Check the factory_config. json for the two single nodes.
Answers
Suggested answer: D

The following critical Availability Alert displays in prism Central:

The protection Policy PP-BCA-1HR includes a business critical application with a 1-hour snapshot frequency.

What is causing this issue?

A.
There is a scheduled outage for the Availability Zone referenced in Protection Policy PP-BCA-1HR.
A.
There is a scheduled outage for the Availability Zone referenced in Protection Policy PP-BCA-1HR.
Answers
B.
Workloads included in PP-BCA-1HR are no longer within their intended RPO.
B.
Workloads included in PP-BCA-1HR are no longer within their intended RPO.
Answers
C.
Prism Central in the Availability Zone for PP-BCA-1HR is unavailable.
C.
Prism Central in the Availability Zone for PP-BCA-1HR is unavailable.
Answers
D.
NearSync replication between the Availability Zones has fallen out of scope.
D.
NearSync replication between the Availability Zones has fallen out of scope.
Answers
Suggested answer: A