Nutanix NCSE-Core Practice Test - Questions Answers, Page 19
List of questions
Related questions
A prospective customer is concerned about the suitability and design of using Nutanix for an upcoming Avaya IP Office migration. Which type of document should the systems engineer (SE) Provide?
A customer asks for a quote for a hybrid cluster to run general purpose VMs and an ERP application.
The customer has a vSAN ReadyNode quote already and is looking for a comparable Nutanix solution. They share the following bill of materials: 3 Hosts , 2x E5-2640v4 CPUs , 512GB RAM , 1 x 480GB SSD , 2 x 8TB HDD , 2 x 1GB NIC What are two reasons to avoid sizing to match a competitor's bill of materials ? (Choose two)
Over what period of time does the Nutanix Collector provide performance data?
A customer intends to build out their VDI environment over a period of 18 months. They require a consistent user experience as their numbers grow. what element of the Nutanix WebScale architecture would a systems engineer discuss with them?
A customer is evaluating Nutanix to replace their existing 200TB filer. The filer is used to store archived images. To achieve maximum storage density. RF2 and Erasure Coding are proposed. What is the minimum number of nodes required to support the maximum Erasure Coding stripe size of 4/1
(data/parity)?
Which tool could be used to perform a sizing discovery in a general server virtualization environment running both VMware ESXi and Nutanix AHV?
What are two key Nutanix value propositions? (Choose two)
A systems engineer is creating a workload for a Sizer Scenario that requires Disaster Recovery (DR) resources with a Recovery Point Objective (RPO) of 6 hours. The "Protect VMs and other Entities" setting is set to Yes. Async is selected for the RPO. Which two other options must be enabled to have Sizer create a DR cluster? (Choose two)
A prospective customer is concerned about having a single-pane-of-glass manage their infrastructure because it also provides a single-point-of-failure. How does the Nutanix Prism architecture address this concern?
A prospect has 8500GB of capacity provisioned for a non-production VMware cluster. As Part of migrating to Nutanix. the prospect agrees to convert any thick provisioned disks to thin provisioned disks. Based on additional dat a. the total active working set for the cluster has been datermined to be 1TB. When entering the Raw input workload into Sizer, what is the minimum amount of HDD Capacity required for the workload?
??
Question