ExamGecko
Home Home / The Open Group / OG0-092

The Open Group OG0-092 Practice Test - Questions Answers, Page 5

Question list
Search
Search

List of questions

Search

Related questions

Scenario: Vittronics Ltd. Please read this scenario prior to answering the question Vittronics Ltd. is a leading medical device manufacturer in the highly competitive market for Migraine Headache Pain Management (MHPM) devices. These tiny wireless devices are implanted in the brain and can deliver a precise electric shock when the wearable Pain Control Unit (PCU) detects an increase in stress induced by the onset of a migraine headache. This technology will be a breakthrough in the treatment of this condition, and several competitors are striving to be the first to introduce a product into the market. However, all of them must demonstrate the effectiveness and safety of their products in a set of clinical trials that will satisfy the regulatory requirements of the countries in the target markets. The Enterprise Architecture group at Vittronics has been engaged in an architecture development project to create a Secure Private Immersive Collaborative Environment (SPICE) that will allow researchers at its product development laboratories worldwide to share information about their independent clinical trials. The Vittronics Enterprise Architecture group is a mature organization that has been utilizing TOGAF for several years. They have recently upgraded to TOGAFA. The Vittronics Architecture Development Method (VADM) is strictly based on the TOGAF 9 Architecture Development Method (ADM) with extensions required to support current good manufacturing practices and good laboratory practices in their target markets.The SPICE project team has now completed the Business, Information Systems, and Technology Architecture phases and has produced a complete set of deliverables for each phase. Due to the highly sensitive nature of the information that is managed in SPICE, special care was taken to ensure that each architecture domain included an examination of the security and privacy issues that are relevant for each domain. A corresponding SPICE Security Architecture has been defined.The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity.Refer to the Vittronics Ltd Scenario:You are serving as the Lead Architect for the SPICE project team.As required by TOGAF, the SPICE project team res completed a Business Transformation Readiness Assessment in Phase A (Architecture Vision). In that assessment, it was determined that there are risks associated with the adoption of the Immersive Collaborative Environment. Despite a clear expression of the vision and the business need for utilizing SPICE to accelerate the clinical trials, the researchers have been resisting the change because of concerns about safeguarding individually identifiable information about the subjects who were participating in the trials.You have been asked to recommend how this situation be managed in the implementation planning phases.Based on TOGAF 9, which of the following is the best answer?

Scenario: AGEX Inc. Please read this scenario prior to answering the question AGEX is a large, global commodities trading company which has been growing rapidly through a series of acquisitions. Each new business is performing well in its markets. However, the lack of integration between headquarters and the business units has increasingly caused problems in the handling of customer and financial information. The inability to share information across businesses has resulted in lost opportunities to "leverage the synergies" that had been intended when the businesses were acquired. At present, each business unit maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, supplier, and inventory information, each business unit has different ways of defining each of these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone. As a result, AGEX has begun implementing a single Enterprise Resource Planning (ERP) system to consolidate information from several applications that exist across the lines of business. The Corporate Board is concerned that the new ERP system must be able to manage and safeguard customer information in a manner that meets or exceeds the legal requirements of the countries in which the company operates. This will be an increasingly important capability as the company expands its online services offered to clients and trading partners. The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is to coordinate efforts between the ERP implementation team and the business unit personnel who will be involved in the migration process. The CIO has also formed a cross-functional Architecture Review Board to oversee and govern the architecture. After reviewing the available alternatives, and based on recommendations from the ERP vendor, AGEX has selected TOGAF 9 as the basis for its Enterprise Architecture program. The CIO has endorsed this choice with the full support of top management. Refer to the AGEX Inc. Scenario You are serving as the Chief Architect. As part of the process for establishing the Enterprise Architecture department, you have decided to create a set of principles to guide the activities. You have been asked to recommend the best approach for this work. Based on TOGAF 9, which of the following is the best answer?

Scenario Please read this scenario prior to answering the question You are serving as the Lead Architect for the Enterprise Architecture team at a multinational company. The company has grown rapidly by acquisition and has inherited numerous supply chain processes and related IT systems. Several supply chain processes have had problems related to the timing of purchases, which has led to excess inventory. The Vice President in charge of Supply Chain Management has made the decision to consolidate and reduce redundant processes and systems. The company will move to a "Just-in-time" supply chain management so as to keep inventory costs low. The TOGAF standard is followed for internal Enterprise Architecture activities. This project is using an iterative approach for executing the Architecture Development Method (ADM). At present, there are no architectural assets in the Architecture Repository related to this initiative. All assets will need to be acquired, customized, or created. The company prefers to implement commercial off the shelf package applications with little customization. The CIO, who is the project sponsor, has stated that she is not concerned about preserving the existing supply chain management processes or systems. The architecture development project has completed Phase A and has started a number of iteration cycles to develop the Architecture. As a packaged application is being considered, the next iteration will include both the Business and Application Architectures. Key stakeholder concerns that should be addressed by these architectures include:

Scenario Please read this scenario prior to answering the question Your role is that of Lead Enterprise Architect within the staff headquarters of a large hotel chain. The chain manages over 500 hotels across North America and Canada, with another 230 hotels internationally in the United Kingdom, Europe, Australia and New Zealand. Unlike other hotel chains, which are often a mix of company-owned and franchised units, each hotel in the chain is an independently owned and operated franchise. Many of the hotels use the same internal IT systems that they used before they joined the franchise. Until recently, the only requirement that has been placed on each hotel is that they use a standard financial reporting system to report their financial results to the headquarters on a weekly basis. The CEO of the chain has stated his concerns about the inefficiencies of the current approach and identified the need to change. He has defined a new strategic vision that will enhance the business by providing its franchisees new support services including worldwide reservations, global, national and regional marketing as well as consolidated financials, logistics, and yield management. This strategy is part of the long-term commitment to enhance the brand image and drive superior revenue for the chain. He has also stated that he expects improved financial results by the end of the current fiscal year. These changes will provide the chain with improved utilization of its capacity and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising into key national and regional markets to improve yields. The chain has a mature enterprise architecture practice based in its headquarters and uses TOGAF 9 as the method and guiding framework. The CIO is the sponsor of the activity. In planning this change, the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO's vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations. Based on the recommendations from the initial study, the chain has taken the decision to adopt a packaged suite of integrated applications that is tailored to the needs of the hospitality industry. Refer to the scenario You have been asked by the Chief Architect to propose the best approach for architecture development to realize the CEO's vision. Based on TOGAF, which of the following is the best answer?


Scenario: Please read this scenario prior to answering the Question You have been appointed as a consultant to the Lead Enterprise Architect of an international agricultural company that exports bulbs, flowers and seeds worldwide. The company has its headquarters in the Netherlands, and has sales and distribution centers in over 30 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities. To achieve full integration of their research capabilities with their development centers located in various climate zones, the company wants to develop strong self-directed teams in each location. It also wants to define new business models that are profitable while reducing their impact on the environment. The management team is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes. The international operations of the company are subject to legal and regulatory requirements for each country where they operate. The production of genetically modified seeds has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds. The Governing Board is concerned about the risks posed in this complex global environment, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested to be informed about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs. TOGAF 9 has been mandated as the framework for the development and evolution of the Enterprise Architecture practice. The Preliminary Phase has been completed to establish the enterprise architecture capability for this project. Refer to the Scenario You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Governing Board, legal staff, auditors and the research organization. Based on TOGAF 9, which of the following is the best answer?

Scenario: Please read this scenario prior to answering the question Your role is consultant to the Lead Architect within a company that manufactures a variety of small electromechanical devices. The company is organized as independent operational divisions. The company has a mature Enterprise Architecture practice and uses TOGAF standard for the basis of its architecture framework. In addition to the EA program, the company has a number of management frameworks in use, including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO. Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufacturing requirements. The enterprise architects have analyzed the key corporate change attributes and implementation constraints. A consolidated gap analysis has been completed which has identified the gaps across the Business, Data, Application, and Technology domains. Based on the results of the gap analysis, the architects have reviewed the requirements, dependencies and interoperability requirements needed to integrate the new ERP environment into the existing environment. The architects have completed the Business Transformation Readiness Assessment started in PhaseA. Based on all of these factors they have produced a risk assessment. The implementation process is estimated to take four years. Because of the risks posed by the complexity of the current environment, a phased approach is needed to implement the target architectures. The implementation and Migration Plan v0 1, the draft Architecture Roadmap, and the Capability Assessment deliverables are now complete. Refer to the Scenario You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan. Based on TOGAF standard, which of the following is the best answer?

Scenario Please read this scenario prior to answering the question Your role is that of Lead Enterprise Architect working at the headquarters of a fast food chain. The chain manages over 7500 restaurants across 33 countries. Each restaurant in the chain is an independently owned and operated franchise. Many of the restaurants still use the first generation IT systems deployed over 10 years ago. The Chief Operating Officer (COO) of the chain has stated his concerns about the inefficiencies of the current systems and identified the need to change. He has defined a new strategic vision that will enhance the business including providing its franchisees new support services to help them address the increasing competition from coffee shops. This is part of the long-term commitment to enhance the brand image and increase revenue for the chain. He has also stated that he expects improved financial results by the end of the current fiscal year. The changes will help provide the chain with improved products, including healthier alternatives in the menu, and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising and new products to specific regions. The chain has a mature Enterprise Architecture practice based in its headquarters and uses the TOGAF standard as the method and guiding framework. The CIO is the sponsor of the activity. In planning the change, the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the COO's vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations. Based on the recommendations from the initial study, the decision has been taken for the chain to adopt a packaged suite of integrated applications that is tailored to the needs of the franchise. Refer to the scenario You have been asked by the Chief Architect to propose the best approach for architecture development to realize the COO's vision. Based on the TOGAF standard, which of the following is the best answer?

Scenario Please read this scenario prior to answering the question You are serving as the Lead Architect for an enterprise architecture project team within a leading multinational pharmaceutical and medical devices manufacturer. Its brands include numerous household names for medications and first aid supplies. The company has a long history of innovating new treatments for many common illnesses and diseases. Prior to launching a new treatment, the company has to demonstrate its effectiveness and safety in a set of clinical trials that satisfy the regulatory requirements of the countries in the target markets. All clinical trials are undertaken by its research laboratories, which employ over 10,000 people at separate facilities in the United Kingdom, United States, Sweden, France, Canada, India, China and Japan. In addition to internal research and development activities the company is also involved in publicly funded collaborative research projects, with other industrial and academic partners. The Enterprise Architecture group within the company has been engaged in an architecture development project to create a secure networked collaboration system that will allow researchers at its product development laboratories worldwide to share information about their clinical trials. This system will also connect with external partners. The Enterprise Architecture group is a mature organization. They use the TOGAF 9 ADM with extensions required to support current good manufacturing practices and good laboratory practices in their target markets. Due to the highly sensitive nature of the information that is managed, special care was taken to ensure that each architecture domain included an examination of the security and privacy issues that are relevant. The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity. She has stated that the changes to the enterprise architecture for the new system will need to be rolled out in stages on a regional basis that minimizes disruptions to ongoing clinical trials. Refer to the Scenario You have been asked to recommend the approach to identify the work packages that will be included in the Transition Architecture(s). Based on TOGAF, which of the following is the best answer?

Scenario: Florian Flowers BV Please read this scenario prior to answering the question Florian Flowers BV is an international agricultural company exporting flowers and seeds worldwide. Florian is headquartered in Rotterdam in the Netherlands, and has sales and distribution centers in over 60 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities. To achieve full integration of their research capabilities with their development centers located in various climate zones, Florian wants to develop strong self-directed teams in each location. Florian also wants to define new business models that are profitable while reducing their impact on the environment. Florian management is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes. Florians international operations are subject to various legal and regulatory requirements. In areas such as genetically modified seeds, governmental controls are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds. The Governing Board is concerned, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested to be informed about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs. TOGAF 9 has been mandated as the guiding framework for the development and evolution of the Enterprise Architecture practice. Refer to the Florian Flowers BV Scenario Florian management has engaged you as the Lead Consultant to assess the current situation. You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of all these parties. Based on TOGAF 9, which of the following is the best answer?

Carter Woods, a global furniture firm, wants to improve the efficiency of its sales force by replacing their legacy configuration and ordering systems based on manual and paper based processes with an online ordering platform. Carter Woods uses the Architecture Delivery Method from TOGAF 9. The CIO sponsored this activity and the Baseline Architecture was defined on the initial iteration defining: approach, scope and architectural vision including a set of architecture principles related to the Data domain:

Data is an asset.

Data is shared.

Data is accessible.

A set of aspects to clarify arose from the business analysis from the assumption to replace the legacy systems with an online centralized one. These main concerns are: · To identify the changes to existing business processes.

· To identify the data entities that can be shared among the sales agents.

· To clarify how to keep the data secured.

· To identify the list of non-sales application to be integrated with the sales applications

Refer to the scenario above

You, as Lead Enterprise Architect, need to identify the most appropriate architecture viewpoints to address the concerns above mentioned.

Choose one of the following answers

A.
Depict the Business Architecture using a Role catalog and a Process/Event/Control/Product catalog. Depict the Data Architecture using a System/Data matrix, a Data Entity/Data Component catalog and Data Security diagram. Depict theApplication Architecture using an Interface catalog. Define the Technology Architecture via a Network Computing/Hardware diagram.
A.
Depict the Business Architecture using a Role catalog and a Process/Event/Control/Product catalog. Depict the Data Architecture using a System/Data matrix, a Data Entity/Data Component catalog and Data Security diagram. Depict theApplication Architecture using an Interface catalog. Define the Technology Architecture via a Network Computing/Hardware diagram.
Answers
B.
Depict the Business Architecture using a Business Interaction matrix and a Location catalog. Depict the Data Architecture using a Data Lifecycle diagram and a Data Migration diagram. Depict the Application Architecture using a SoftwareEngineering diagram. Depict the Technology Architecture using aCommunications Engineering diagram.
B.
Depict the Business Architecture using a Business Interaction matrix and a Location catalog. Depict the Data Architecture using a Data Lifecycle diagram and a Data Migration diagram. Depict the Application Architecture using a SoftwareEngineering diagram. Depict the Technology Architecture using aCommunications Engineering diagram.
Answers
C.
Depict the Business Architecture using a Business Footprint diagram and a Location catalog. Depict the Data Architecture using a Data Migration diagram, System/Data matrix and Data Lifecycle diagram. Depict the ApplicationArchitecture using an Application Communication diagram. Depict the Technology Architecture using a Network Computing/Hardware diagram.
C.
Depict the Business Architecture using a Business Footprint diagram and a Location catalog. Depict the Data Architecture using a Data Migration diagram, System/Data matrix and Data Lifecycle diagram. Depict the ApplicationArchitecture using an Application Communication diagram. Depict the Technology Architecture using a Network Computing/Hardware diagram.
Answers
D.
Depict the Business Architecture using a Role catalog and Location catalog. Depict the Data Architecture using a System/Data matrix, Data Entity/Business Function matrix and Data Security diagram. Depict the Application Architectureusing an Application Interaction matrix. Define the Technology Architecture via a Network Computing/Hardware diagram.
D.
Depict the Business Architecture using a Role catalog and Location catalog. Depict the Data Architecture using a System/Data matrix, Data Entity/Business Function matrix and Data Security diagram. Depict the Application Architectureusing an Application Interaction matrix. Define the Technology Architecture via a Network Computing/Hardware diagram.
Answers
Suggested answer: A

SureFlight Air Carrier has received approval for the acquisition of a regional carrier.

To integrate the new acquisition, a TOGAF based enterprise architecture program has been initiated. The CIO sponsors the activity supported by the Chief Architect. In Phase A within the initial iteration the CIO wants to ensure that the architecture activities are recognized among the various stakeholders of the enterprise.

Refer to the scenario above

You are a consultant supporting the Chief Architect that should explain how to identify and engage the stakeholders at this stage of the program.

Identify the best answer accordingly to the TOGAF 9 guidelines. Choose one of the following answers

A.
Using the business scenarios technique you would identify supporting and not supporting stakeholders.Then you would list the set of viewpoints that are addressing the stakeholder concerns and share these with them.
A.
Using the business scenarios technique you would identify supporting and not supporting stakeholders.Then you would list the set of viewpoints that are addressing the stakeholder concerns and share these with them.
Answers
B.
You first priority is to communicate with the regional carrier stakeholders developing a CommunicationsPlan to share main features and discuss opportunities with them.
B.
You first priority is to communicate with the regional carrier stakeholders developing a CommunicationsPlan to share main features and discuss opportunities with them.
Answers
C.
You conduct a pilot proof of concept during Phase A to demonstrate the technical feasibility to the stakeholders explaining the approach available from your preferred suppliers.
C.
You conduct a pilot proof of concept during Phase A to demonstrate the technical feasibility to the stakeholders explaining the approach available from your preferred suppliers.
Answers
D.
You identify all the main stakeholders on both the acquired carrier and the rest of the enterprise. Using a stakeholder map, you classify and record their power in relation to this activity. You then focus on implementing the relevantviewpoints that can address the concerns of every main stakeholder identified in the stakeholders map.
D.
You identify all the main stakeholders on both the acquired carrier and the rest of the enterprise. Using a stakeholder map, you classify and record their power in relation to this activity. You then focus on implementing the relevantviewpoints that can address the concerns of every main stakeholder identified in the stakeholders map.
Answers
Suggested answer: D

McKinley Rockets is an enterprise that employs 20,000 men and women in five countries: UK, Italy, France, Spain and the Netherlands and its mission is to guarantee access to space offering space transportation, launch and management of satellite systems at low cost.

A TOGAF 9 mature Enterprise Architecture program is already established within the enterprise. McKinley Rockets strategy is to leverage in the USA shortage of satellite launches availability - that NASA created because of the Shuttle program shutdown - by acquiring an important merican space agency. This will ultimately allow McKinley Rockets to offer its services to the US market. The new acquired company NovaSpace is very successful but with outdated satellite monitoring systems. The CIO is sponsoring an activity to extend the McKinley Rockets' satellite monitoring applications to include the NovaSpace's satellites flock.

A task force of enterprise architects prepared an Architecture Vision and secured the approval. The Architecture Board decided to approve the vision, provided that the Design Definition Document is presented for review at phase D conclusion.

Refer to the scenario above

The Chief Architect asked you as Lead Integration Architect to use TOGAF 9 to recommend the best approach to design the Full Architecture and present it to the Architecture Board. Identify the best answer accordingly to the TOGAF 9 guidelines.

Choose one of the following answers

A.
You start with the Business Architecture and then address Technology, Application and Data domains. For every domain you select the relevant reference models, viewpoints, and tools. You develop a Target and Baseline Architecture Descriptions. Then perform Gap Analysis, resolve impacts across the Architecture Landscape and update the roadmap. Finally update the Architecture Definition Document.
A.
You start with the Business Architecture and then address Technology, Application and Data domains. For every domain you select the relevant reference models, viewpoints, and tools. You develop a Target and Baseline Architecture Descriptions. Then perform Gap Analysis, resolve impacts across the Architecture Landscape and update the roadmap. Finally update the Architecture Definition Document.
Answers
B.
You start with the Business Architecture and then address Data, Application and Technology domains. You then Confirm management framework interactions for the Implementation and Migration Plan, Prioritize the migration projectsthrough the conduct of a cost/benefit assessment and risk validation.Then perform Gap Analysis and update the Architecture Definition Document.
B.
You start with the Business Architecture and then address Data, Application and Technology domains. You then Confirm management framework interactions for the Implementation and Migration Plan, Prioritize the migration projectsthrough the conduct of a cost/benefit assessment and risk validation.Then perform Gap Analysis and update the Architecture Definition Document.
Answers
C.
You start with the Business Architecture and then address Data, Application and Technology domains. For every domain you select the relevant reference models, viewpoints, and tools. You develop a Baseline and Target Architecture.Then perform Gap Analysis, assess the roadmap impacts and finally update the Architecture Definition Document.
C.
You start with the Business Architecture and then address Data, Application and Technology domains. For every domain you select the relevant reference models, viewpoints, and tools. You develop a Baseline and Target Architecture.Then perform Gap Analysis, assess the roadmap impacts and finally update the Architecture Definition Document.
Answers
D.
You start with the Business Architecture and then address Data, Application and Technology domains. For every domain you develop a Baseline and Target Architecture. Then perform Gap Analysis and update the Architecture DefinitionDocument.
D.
You start with the Business Architecture and then address Data, Application and Technology domains. For every domain you develop a Baseline and Target Architecture. Then perform Gap Analysis and update the Architecture DefinitionDocument.
Answers
Suggested answer: C

Chiamin Metals is a leading world-wide manufacturer for continuous casting and bottom pouring powders. In addition to mould powders, the company also produces cored wire for secondary metallurgy. Chiamin Metals offers a variety of products and uses a paper-based catalog to sponsor them. A new CIO has joint the enterprise and has set up a team of Enterprise Architects following the TOGAF 9 practice. The main challenge is now to offer to Chiamin Metals customers a centralized and reliable entry point for their request via the implementation of a global online portal. This will allow the management of new marketing activities and will enable the new Chiamin Metals' ecommerce service.

Refer to the scenario above

You are the Chief Architect and the CIO asked you to present an Architecture Vision to address the above business problem. Identify the best answer accordingly to the TOGAF 9.

Choose one of the following answers

A.
You identify key stakeholders, their concerns, and define the key business requirements to be addressed in the architecture engagement and generate a Stakeholder Map. You Evaluate business capabilities and execute a BusinessTransformation Readiness Assessment. You apply the Business Scenarios technique to create a high-level view of the Baseline and Target Architectures also based on the stakeholder concerns, business capability requirements, scope, constraints, and principles.
A.
You identify key stakeholders, their concerns, and define the key business requirements to be addressed in the architecture engagement and generate a Stakeholder Map. You Evaluate business capabilities and execute a BusinessTransformation Readiness Assessment. You apply the Business Scenarios technique to create a high-level view of the Baseline and Target Architectures also based on the stakeholder concerns, business capability requirements, scope, constraints, and principles.
Answers
B.
As requested by the CIO you focus on the Architecture Vision documentation and apply the Business Scenarios technique to create a high-level view of the Baseline and Target Architectures also based on the stakeholder concerns,business capability requirements, scope, constraints, and principles.
B.
As requested by the CIO you focus on the Architecture Vision documentation and apply the Business Scenarios technique to create a high-level view of the Baseline and Target Architectures also based on the stakeholder concerns,business capability requirements, scope, constraints, and principles.
Answers
C.
You create a high-level view of the Target Architectures and then present them to the CIO.
C.
You create a high-level view of the Target Architectures and then present them to the CIO.
Answers
D.
As requested by the CIO you focus on the Architecture Vision and create a detailed view of the Baseline Architectures. This is done for Business, Data, Application and Technology domains and then presented to the CIO using theArchitecture Definition Document.
D.
As requested by the CIO you focus on the Architecture Vision and create a detailed view of the Baseline Architectures. This is done for Business, Data, Application and Technology domains and then presented to the CIO using theArchitecture Definition Document.
Answers
Suggested answer: A

UTrack Transports is a strong UK logistics company. The head of the strategic marketing division engaged the Principal Architect issuing a Request for architectural work to design an enhancement of the current Enterprise Data Warehouse system. An enhancement is needed to support the change in the business model; UTrack wants to leverage on customer data collected during business as usual activities and anonymize them to offer marketing agencies a fresh and accessible source of analytics data, this will increase the company revenues. TOGAF 9 is the architectural framework in use.

Refer to the scenario above The Principal Architect has decided to ask you as Business Intelligence Subject Matter Expert to design the Data Architecture. The Chief Architect shared with you the Architecture Definition Document including the Business Architecture design. You now need to choose the artifacts you want to produce as part of the Data Architecture design. Identify the best answer accordingly to the TOGAF 9. Choose one of the following answers

A.
You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are stored. You then classify what the data source are and therelationship with the data entities via a System/Data Matrix. You finally identify common data requirements using a Data Lifecycle Diagram.
A.
You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are stored. You then classify what the data source are and therelationship with the data entities via a System/Data Matrix. You finally identify common data requirements using a Data Lifecycle Diagram.
Answers
B.
You first list the data used across the enterprise using a Data Entity/Data Component Matrix, including data entities and also the data components where data entities are stored. You then classify what the data source are and therelationship with the data entities via a Role/System Catalog. You finally identify common data requirements using a Data Use Case Diagram.
B.
You first list the data used across the enterprise using a Data Entity/Data Component Matrix, including data entities and also the data components where data entities are stored. You then classify what the data source are and therelationship with the data entities via a Role/System Catalog. You finally identify common data requirements using a Data Use Case Diagram.
Answers
C.
You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are stored. You then classify what the data source are and therelationship with the data entities via a System/Data Matrix.
C.
You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are stored. You then classify what the data source are and therelationship with the data entities via a System/Data Matrix.
Answers
D.
You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are stored. You then assign ownership of data entities to theorganization via a System/Data Matrix.
D.
You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are stored. You then assign ownership of data entities to theorganization via a System/Data Matrix.
Answers
Suggested answer: A

RIG Networks, a global network supplier is implementing a massive replacement of its supply chain to reduce production cost of their new LTE (Long Term

Evolution) gateways. As part of this renovation process the CIO decided to replace their ERP (Enterprise Resource Planning) system using a greenfield approach (where the legacy ERP system will be decommissioned). The CIO engaged a team of TOGAF 9 certified consultants to design the solution, he then identified the suppliers and asked you as Chief Architect to supervise the definition of the Architecture Design and Development Contract.

Refer to the scenario above

You now need to write the Architecture Design and Development Contract, identify how you would o this following TOGAF 9.

Choose one of the following answers

A.
You would define the Architecture Design and Development Contract with : introduction and background, the nature of the agreement, scope of the architecture, architecture and strategic principles and requirements, conformancerequirements, Target Architecture Measures, Define phases of deliverables,Prioritized joint workplan, Time window, Architecture delivery and business metrics.
A.
You would define the Architecture Design and Development Contract with : introduction and background, the nature of the agreement, scope of the architecture, architecture and strategic principles and requirements, conformancerequirements, Target Architecture Measures, Define phases of deliverables,Prioritized joint workplan, Time window, Architecture delivery and business metrics.
Answers
B.
You would define the Architecture Design and Development Contract with : introduction and background, the nature of the agreement, scope of the architecture, architecture and strategic principles and requirements, conformancerequirements, Baseline Architecture definition, Target ArchitectureMeasures, Define phases of deliverables, Prioritized joint workplan, Time window, Architecture delivery and business metrics.
B.
You would define the Architecture Design and Development Contract with : introduction and background, the nature of the agreement, scope of the architecture, architecture and strategic principles and requirements, conformancerequirements, Baseline Architecture definition, Target ArchitectureMeasures, Define phases of deliverables, Prioritized joint workplan, Time window, Architecture delivery and business metrics.
Answers
C.
You would define the Architecture Design and Development Contract with : Target Architecture Measures, Define phases of deliverables, Prioritized joint workplan, Time window, Architecture delivery and business metrics.
C.
You would define the Architecture Design and Development Contract with : Target Architecture Measures, Define phases of deliverables, Prioritized joint workplan, Time window, Architecture delivery and business metrics.
Answers
D.
You would define the Architecture Design and Development Contract with : scope, goals, objectives and constraints, Architecture Principles, BaselineArchitecture, Architecture Models, Gap Analysis, Impact Assessment.
D.
You would define the Architecture Design and Development Contract with : scope, goals, objectives and constraints, Architecture Principles, BaselineArchitecture, Architecture Models, Gap Analysis, Impact Assessment.
Answers
Suggested answer: A

Dante Manufacturing is a big supplier in the automotive industry, head quarter in London with main plants in New York, Milan, Toronto and Tokio. Each one of these plants has been operating its own Manufacturing Requirements Planning (MRP II) system, production scheduling and custom applications for production automation. Dante's objective is to minimize waste production improving production operations. During an analysis of the process improvements was determined that a significant improvement on waste production could be achieved replacing the outdated MRPII system with a common Enterprise Resource Planning (ERP) located in London. Dante has well-developed governance and processes based on TOGAF 9. The Chief Engineer of Global Manufacturing operations is the business sponsor and issued a Request for Architectural Work. The architectural activity for the implementation of the new ERP platform is kicked off and the architectural vision is produced. Some concerns on the security, reliability, responsibility and time to manage change of driving the MRP II and production scheduling by a central system located in London are raised by the team of architects working on the project and by senior management of the various organizations. These last in particular, stressed the need to align the information management with the business.

Refer to the scenario above As Lead Architect you have been asked to update the IT architectural principles to address the concerns raised by the project stakeholders and the senior management. According to TOGAF 9 (assuming the enterprise is using the example set of principles in TOGAF 9 Section 23.6), which of the following is the best answer?

Choose one of the following answers

A.
Common Use Applications, Data is Shared, Data is Accessible, Data is Secure, Interoperability, Control, Technology Independence.
A.
Common Use Applications, Data is Shared, Data is Accessible, Data is Secure, Interoperability, Control, Technology Independence.
Answers
B.
Business Continuity, Service-Orientation, Data is Shared , Data is Accessible, Data is Secure, Responsive Change Management.
B.
Business Continuity, Service-Orientation, Data is Shared , Data is Accessible, Data is Secure, Responsive Change Management.
Answers
C.
Requirements-Based Change, Ease-of-Use, Data is Normalized.
C.
Requirements-Based Change, Ease-of-Use, Data is Normalized.
Answers
D.
Information Management is Everybody's business, IT Responsibility, Data Trustee, Technology Independence, Responsive Change Management.
D.
Information Management is Everybody's business, IT Responsibility, Data Trustee, Technology Independence, Responsive Change Management.
Answers
Suggested answer: D

MightyGears produces components for the Car industry. Driven by the global financial downturn they are looking to reduce IT costs. They believe there is a cost saving opportunity within IT but this is not quantified in terms of potential savings nor is there an agreed target architecture. Final decisions on the solutions are not yet fully agreed. They have completed the first pass architecture and now are looking at the best opportunities and solutions to meet their financial goals.

You are the Chief Architect from a consulting organization brought into review the work to date by MightyGears and to make recommendations to the CIO and the board on the opportunities and solutions present.

Refer to the scenario above

Which of the following answers best describes how TOGAF recommends examining the opportunities and solutions before presenting to the board?

Choose one of the following answers

A.
I would examine the architecture work today ensuring it is complete and accurate and addressing any gaps. I would look at functional and integration requirements. I would then ensure all dependencies are understood and documented. Iwould then create the necessary artefacts including major work packages and transition architectures and the project charters for the recommended projects for presentation to the board.
A.
I would examine the architecture work today ensuring it is complete and accurate and addressing any gaps. I would look at functional and integration requirements. I would then ensure all dependencies are understood and documented. Iwould then create the necessary artefacts including major work packages and transition architectures and the project charters for the recommended projects for presentation to the board.
Answers
B.
I would assess the architecture work today, create, and priorities projects to transition Widget Inc from the current architecture to target architecture. This will include a business value for each project, the resources required and theintended timing. I would then validate the prioritizations with the board particularly looking at cost benefits and risks. Lastly, I would generate the Architecture Implementation Roadmap and document lessons learned.
B.
I would assess the architecture work today, create, and priorities projects to transition Widget Inc from the current architecture to target architecture. This will include a business value for each project, the resources required and theintended timing. I would then validate the prioritizations with the board particularly looking at cost benefits and risks. Lastly, I would generate the Architecture Implementation Roadmap and document lessons learned.
Answers
C.
I would assess the requirements of the organization particularly those requirements describing the functions required and information flows within the architecture. I would then look to produce artifacts that describe the recommendedprojects, the risk, issues and dependencies. This would also include transition architects to move us from current architecture to the recommended target architectures. I would present my recommendations to the board for agreement. Once this is done, I would update the architectures reflecting any changes resulting from the board discussion.
C.
I would assess the requirements of the organization particularly those requirements describing the functions required and information flows within the architecture. I would then look to produce artifacts that describe the recommendedprojects, the risk, issues and dependencies. This would also include transition architects to move us from current architecture to the recommended target architectures. I would present my recommendations to the board for agreement. Once this is done, I would update the architectures reflecting any changes resulting from the board discussion.
Answers
D.
I would look at the corporate culture and attitude to change, understand the constraints such as cost and the required time horizons. I would then look at the architecture work to ensure it is complete and seek to address any gaps. I wouldreview the functional requirements and ensure there are complete interoperability requirements. I would then validate any dependencies and risks. Then formulate an implementation and migration strategy identifies major work packages and the transition architecture required. Finally, once agreement is reached with the board I will create project charters and re-factor any changes needed from the board discussion into the architecture.
D.
I would look at the corporate culture and attitude to change, understand the constraints such as cost and the required time horizons. I would then look at the architecture work to ensure it is complete and seek to address any gaps. I wouldreview the functional requirements and ensure there are complete interoperability requirements. I would then validate any dependencies and risks. Then formulate an implementation and migration strategy identifies major work packages and the transition architecture required. Finally, once agreement is reached with the board I will create project charters and re-factor any changes needed from the board discussion into the architecture.
Answers
Suggested answer: A

Scenario

Please read this scenario prior to answering the question Your role is consultant to the Lead Architect within a multinational semiconductor and software design company. Its largest business is in processors, although it also designs system-on-a-chip infrastructure and manufactures memory chips. A characteristic feature of its processors is their low electric power consumption, which makes them particularly suitable for use in portable devices. As well as licensing its technology, the company has several manufacturing divisions.

The company has a mature enterprise architecture practice and uses TOGAF Standard for the basis of its architecture framework. In addition to the EA program, the company has a number of management frameworks in use, including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.

The company has defined a strategic architecture to improve its ability to meet customer demand and improve its ability to manage its supply chain. The strategic architecture called for the consolidation of multiple Enterprise Resource Planning (ERP) applications that have been operating independently in the divisions' production facilities. The goal is to replace the functionality of the existing applications with a new ERP product running as a single instance in the company's primary data center.

Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufacturing requirements.

The enterprise architects have analyzed the key corporate change attributes and implementation constraints. A consolidated gap analysis has been completed which has identified the gaps across the Business, Data, Application, and Technology domains. Based on the results of the gap analysis, the architects have reviewed the requirements, dependencies and interoperability requirements needed to integrate the new ERP environment into the existing environment. The architects have completed the Business Transformation Readiness

Assessment started in PhaseA. Based on all of these factors they have produced a risk assessment. They have also completed the Implementation and Migration Plan v0.1, the draft Architecture Roadmap, and the Capability Assessment deliverables.

Because of the risks posed by the complexity of the current environment, it has been determined that a phased approach is needed to implement the target architectures. The overall implementation process is estimated to take several years.

Refer to the Scenario

You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.

Based on TOGAF Standard Version 9.2, which of the following is the best answer?

A.
You recommend that the enterprise architects apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performanceevaluation criteria that can be used to monitor the progress of the architecture transformation. They should confirm the Transition Architecture phases using an Architecture Definition Increments Table to list tine projects.They should then document the lessons learned and generate the final Implementation and Migration Plan.
A.
You recommend that the enterprise architects apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performanceevaluation criteria that can be used to monitor the progress of the architecture transformation. They should confirm the Transition Architecture phases using an Architecture Definition Increments Table to list tine projects.They should then document the lessons learned and generate the final Implementation and Migration Plan.
Answers
B.
You recommend that the enterprise architects conduct a series of Compliance Assessments to ensure that the architecture is being implemented according to the contract. The Compliance Assessment should verify that theimplementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements should be identified and updated in the Implementation and Migration Plan.
B.
You recommend that the enterprise architects conduct a series of Compliance Assessments to ensure that the architecture is being implemented according to the contract. The Compliance Assessment should verify that theimplementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements should be identified and updated in the Implementation and Migration Plan.
Answers
C.
You recommend that the enterprise architects assess how the plan impacts the other frameworks in use in the organization. Minimally, the plan should be coordinated with the business planning, portfolio/project management andoperations management frameworks. They should then assign a business value to each project, taking into account available resources and priorities for the projects. Finally, they should generate the Implementation and Migration Plan.
C.
You recommend that the enterprise architects assess how the plan impacts the other frameworks in use in the organization. Minimally, the plan should be coordinated with the business planning, portfolio/project management andoperations management frameworks. They should then assign a business value to each project, taking into account available resources and priorities for the projects. Finally, they should generate the Implementation and Migration Plan.
Answers
D.
You recommend that the enterprise architects place the Architecture Definition Document under configuration control. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. They should thenproduce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be applied as changes to the architecture without review.
D.
You recommend that the enterprise architects place the Architecture Definition Document under configuration control. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. They should thenproduce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be applied as changes to the architecture without review.
Answers
Suggested answer: D

Scenario

Please read this scenario prior to answering the question You have been appointed as a consultant to the Chief Enterprise Architect of a multinational pharmaceutical corporation. The corporation includes 30 subsidiary companies with operations in over 60 countries and products sold in over 125 countries. It has major research and development sites in over 45 locations worldwide.

The management team is deeply committed to ensuring that the corporation is a world leader in socially responsible pharmaceutical development with a business strategy that focuses on profitability through environmentally friendly operating processes as well as a commitment to disease eradication.

The operations of the corporation are subject to legal and regulatory requirements for each country where they operate. The production of prescription pharmaceutical products has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was conducting a clinical trial for a new regulated drug.

The Governing Board is concerned about the risks posed in this complex global environment. As a result the Chief Executive Officer (CEO) has appointed a Chief Compliance Officer (CCO) to be responsible for overseeing and managing compliance issues for the corporation. The CCO reports directly to the CEO.

The CCO has approved the expenditure of resources to establish an Enterprise Architecture program. He has requested to be informed about the status of projects that could impact regulatory compliance. He also wants the corporate legal staff and auditors to analyze all proposed architectures to ensure that they are within the legal guidelines for each country. In addition, the research organization should be able to see that the architecture is appropriate for its needs.

TOGAF 9 has been mandated as the framework for the development and evolution of the Enterprise Architecture practice. The Preliminary Phase has been completed to establish the enterprise architecture capability for this project.

Refer to the Scenario

You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Chief Compliance

Officer, legal staff, auditors and the research organization.

Based on TOGAF, which of the following is the best answer?

A.
You recommend that a stakeholder map be developed. This will allow the architects to define groups of stakeholders that share common concerns. A set of views should be defined to address the concerns for each group of stakeholders.Architecture models should then be created for each view to address the stakeholders' concerns.
A.
You recommend that a stakeholder map be developed. This will allow the architects to define groups of stakeholders that share common concerns. A set of views should be defined to address the concerns for each group of stakeholders.Architecture models should then be created for each view to address the stakeholders' concerns.
Answers
B.
You recommend that each project architecture activity is developed using a consistent modeling approach that is uniform across all architecture projects.Each architecture should be defined based on this fixed set of models so that allconcerned parties can examine the models to ensure that their issues and concerns have been addressed.
B.
You recommend that each project architecture activity is developed using a consistent modeling approach that is uniform across all architecture projects.Each architecture should be defined based on this fixed set of models so that allconcerned parties can examine the models to ensure that their issues and concerns have been addressed.
Answers
C.
You recommend that a special report be created for those groups that have sufficient power and level of interest. This report should summarize the key features of the architecture with respect to the particular location. Each of thesereports should reflect the stakeholders' requirements.
C.
You recommend that a special report be created for those groups that have sufficient power and level of interest. This report should summarize the key features of the architecture with respect to the particular location. Each of thesereports should reflect the stakeholders' requirements.
Answers
D.
You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should then view the models to verify that their concernshave been properly addressed.
D.
You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should then view the models to verify that their concernshave been properly addressed.
Answers
Suggested answer: D
Total 75 questions
Go to page: of 8