SIMULATION

You are a functional consultant for Contoso Entertainment System USA (USMF).

You need to schedule the Material Requirements Planning (MRP) master plan to run nightly at 03:00 (UTC-8).

To complete this task, sign in to Dynamics 365 portal.

A.

Explanation:

Answers
A.

Explanation:

Suggested answer: A

Explanation:

You need to configure a batch job to run the master plan nightly.

Create the batch job

1. Go to Navigation pane > Modules > System administration > Inquiries > Batch jobs.

2. Click New.

3. In the Job description field, type a value.

4. In the Scheduled start date/time field, enter a date and time.

5. Click Save.

Create a recurrence

1. On the Action Pane, click Batch job.

2. Click Recurrence. Use these options to enter a range and pattern for the recurrence.

3. Click OK.

Reference: https://docs.microsoft.com/en-us/dynamics365/fin-ops-core/dev-itpro/sysadmin/tasks/create-batch-job