A platform engineer must replace a failed chassis on a Dell PowerScale Gen6 cluster. What must the engineer do after powering off the nodes?
A.
Remove the drive sleds, label them for identification, and place the drive sleds In the newly installed chassis.
B.
Remove the drive sleds and motherboard and transfer them to the new chassis.
C.
Remove the drives and compute modules and reimage each drive before installing them in the chassis.
D.
Remove the drives, install the chassis, and place the drives in the new chassis.