You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note: There are 2 correct answers to this question
A.
Assign a measuring point as a production resources/tools (PRT) to a task list operation.
B.
Assign a piece of equipment with an allocated measuring point to a task list operation
C.
Assign an inspection lot to the task list header
D.
Assign an inspection document as a PRT to the task list operation.