VMware 5V0-21.21 Practice Test - Questions Answers, Page 6
List of questions
An architect is currently working with a customer to transform their existing ESXi hosts to vSAN nodes. The customer expressed the following requirements.
* First phase will transform 50% of the hosts to a hybrid vSAN nodes.
* Second phase will transform the remaining 50% hosts to an All-Flash vSAN nodes.
The following constraint exists:
* Each host has a 4-port x 1 GbE network interface.
Which two recommendations should the architect make to align with the customer's requirements? (Choose two.)
Which three steps are required to decommission a stretched cluster and convert it to a standard vSAN cluster? (Choose three.)
An architect is tasked with designing a solution that includes the following requirements:
* The solution must support 5,000 virtual machines.
* The solution must include software defined storage.
* The deployment of the solution must be automated.
* The solution must provide storage-policy based disaster recovery for all workloads.
Which combination of three products will fulfill these requirements? (Choose three.)
An organization has two vSAN clusters managed by the same vCenter server, each providing 100 TB of storage. The first cluster runs at 75% of its storage capacity, and the second cluster runs at 40% of its storage capacity.
The company also has the following:
* an iSCSI array of 300 TB, which runs at 76% of its capacity
* a NAS system of 200 TB, which runs at 10% of its capacity
* a Fiber channel (FC) array of 300 TB, which runs at 80% of its capacity
The administrator is asked to add an additional 25 TB of storage to the first cluster but is also made aware that there is no budget to purchase new hardware and that the vSAN Storage Policy Based Management must be kept in place.
Which storage option will work for this use case?
An administrator is troubleshooting vSAN performance issues, and the performance diagnostics reports:
'There are errors seen in one or more physical NICs on one or more hosts.'
Which two problems must be resolved to fix this issue? (Choose two.)
An architect is reviewing a vSAN cluster that has an unbalanced cluster configuration.
Which behavior will the architect observe?
During a vSAN design workshop, a customer expressed a requirement to decommission an existing enterprise NAS device that provides iSCSI services for a clustered application.
Based on the current state analysis, the following information was noted:
* Current utilization is 500 LUNs.
* All clustered workloads are configured for Multiple Connections per Session.
* LUN sizes range between 10 TB to 30 TB.
What should the architect state regarding the requirements?
An administrator has noticed that a number of the virtual machines in the preferred site are showing as either failed or partitioned.
In which two ways would the administrator expect the virtual machines to respond? (Choose two.)
An administrator notes that the Data-At-Rest Encryption keys have expired.
Which action is needed to resolve this situation?
cluster for a customer who is planning to use vRealize Automation to provision 600 virtual machines into that cluster, with expected growth up to 1,000 VM. Each VM has a 40GB thick-provisioned disk.
Which flash disk size is required for the cache tier per ESXi node to meet all requirements?
Question