Question 11

Report Export Collapse

Which of the following is a prerequisite for external refurbishment?

Define the order type for external refurbishment.

Define the order type for external refurbishment.

Select the material group for externally refurbished materials.

Select the material group for externally refurbished materials.

Assign an external work center to a maintenance order operation

Assign an external work center to a maintenance order operation

Activate the subcontracting indicator in an external activity.

Activate the subcontracting indicator in an external activity.

Suggested answer: D
Explanation:

External refurbishment is the process of sending defective or worn-out spare parts to an external vendor for repair or replacement. To carry out this process, you need to create a maintenance order with an external operation that has the subcontracting indicator activated. This indicator allows you to create a purchase requisition and a purchase order for the external service. The external operation also requires an external work center, a control key, and a material component with the valuation type of the defective part. The order type for external refurbishment is not a prerequisite, but a configuration option that can be used to differentiate the process from internal refurbishment. The material group for externally refurbished materials is not relevant for the process, as the material master data is not changed by the refurbishment. The assignment of an external work center to a maintenance order operation is necessary, but not sufficient, for external refurbishment. You also need to activate the subcontracting indicator in the external activity.Reference:

Explaining Refurbishment of Spare Parts, section ''Refurbishing Spare Parts Externally''

Refurbishment of Repairable Spares: Integration between SAP-PM and SAP-MM, section ''4.2 External Refurbishment: Major Steps''

asked 31/10/2024
janet phillips
37 questions

Question 12

Report Export Collapse

What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.

Goods receipts for external services can be entered.

Goods receipts for external services can be entered.

The planner can change planned costs at the operation level

The planner can change planned costs at the operation level

The planner can change estimated costs only at the header level

The planner can change estimated costs only at the header level

The controller can determine actual cost surcharges.

The controller can determine actual cost surcharges.

The assignment of the notification to the maintenance order header cannot be deleted.

The assignment of the notification to the maintenance order header cannot be deleted.

Suggested answer: A, B, E
Explanation:

A maintenance order with status REL means that the order is released and ready for execution. At this stage, the following characteristics apply:

A . Goods receipts for external services can be entered. This is true because external services are procured through purchase orders that are linked to the maintenance order. The service performer can post service entry sheets to record the executed work and consumable materials.These service entry sheets can be approved and posted as goods receipts for external services1.

B . The planner can change planned costs at the operation level. This is false because once the order is released, the planned costs are frozen and cannot be changed by the planner.The planner can only change the estimated costs at the header level2.

C . The planner can change estimated costs only at the header level. This is true, but it is not a characteristic of a released order.The planner can change the estimated costs at any time, even before the order is released2.

D . The controller can determine actual cost surcharges. This is true because the controller can use the business function LOG_EAM_CI_7 to calculate and post actual cost surcharges for maintenance orders.This function can be used for orders with status REL or TECO3.

The assignment of the notification to the maintenance order header cannot be deleted. This is true because the notification is the source document for the maintenance order and provides the reason for the order.The notification can only be deleted if the order is deleted or set to status CRTD.Reference:1:Lean and Limit Value Services in Maintenance Order2:Maintenance Order Cost Analysis3: Actual Cost Surcharges for Maintenance Orders : Notification Assignment to Maintenance Order

asked 31/10/2024
Komalaharshini Basireddygari
48 questions

Question 13

Report Export Collapse

Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question

Generate Inspection Lols within the checklists view.

Generate Inspection Lols within the checklists view.

Link PM task list with assigned inspection point type to a maintenance item.

Link PM task list with assigned inspection point type to a maintenance item.

Record the usage decision for an Inspection Lot

Record the usage decision for an Inspection Lot

Generate Inspection Lots assigned to maintenance order headers.

Generate Inspection Lots assigned to maintenance order headers.

Suggested answer: A, C
Explanation:

The inspection checklist process is an end-to-end process from the creation of inspection plans to results recording and follow-up actions in Plant Maintenance. The necessary steps of the inspection checklist process are:

Generate object lists for the maintenance order, which contain the technical objects to be inspected.

Generate inspection checklists for the maintenance order, which contain the inspection lots based on the inspection plans assigned to the technical objects.

Record the inspection results for the inspection characteristics in the inspection lots.

Record the usage decision for the inspection lots, which determines whether the technical objects are accepted or rejected.

Therefore, option A (Generate Inspection Lots within the checklists view) and option C (Record the usage decision for an Inspection Lot) are correct, while option B (Link PM task list with assigned inspection point type to a maintenance item) and option D (Generate Inspection Lots assigned to maintenance order headers) are not part of the inspection checklist process.

Explaining Inspection Checklists

Set up your SAP S/4HANA system for EAM Inspection Checklists

asked 31/10/2024
Puth Sovann
51 questions

Question 14

Report Export Collapse

Which objects can you assign to a Maintenance Service Order Item? Note: There are 2 correct answers to this question.

Service Product

Service Product

DIP Profile

DIP Profile

Service Work Center

Service Work Center

Service Master Record

Service Master Record

Suggested answer: A, B
asked 31/10/2024
David Wilson
42 questions

Question 15

Report Export Collapse

Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?

SAP Asset Strategy and Performance Management

SAP Asset Strategy and Performance Management

SAP Lumira Designer

SAP Lumira Designer

SAP S/4HANA Core Data Services

SAP S/4HANA Core Data Services

SAP Predictive Analysis

SAP Predictive Analysis

Suggested answer: B
Explanation:

The Technical Object Breakdowns and Technical Object Damages app use SAP Lumira Designer to display data in a user-friendly and interactive way. SAP Lumira Designer is a tool that allows you to create analytical applications and dashboards based on SAP S/4HANA Core Data Services (CDS) views. SAP Asset Strategy and Performance Management and SAP Predictive Analysis are not components used to display data in this app, but they are other solutions that can help you optimize your asset management strategy and performance.

Reference:

Technical Object Breakdowns

Technical Object Damages

[SAP Lumira Designer]

asked 31/10/2024
Anass Chadid ansari
48 questions

Question 16

Report Export Collapse

Which functions characterize a Strategic analysis as opposed to embedded analysis within the SAP S/4HANA core system? Note: There are 2 correct answers to this question

Become a Premium Member for full access
  Unlock Premium Member

Question 17

Report Export Collapse

Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question.

Become a Premium Member for full access
  Unlock Premium Member

Question 18

Report Export Collapse

How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question

Become a Premium Member for full access
  Unlock Premium Member

Question 19

Report Export Collapse

Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers to this question

Become a Premium Member for full access
  Unlock Premium Member

Question 20

Report Export Collapse

Which options do you have in SAP S/4HANA Asset Management, Public Cloud Edition? Note: There are 2 correct answers to this question