ExamGecko
Home / Six Sigma / ICGB
Ask Question

Six Sigma ICGB Practice Test - Questions Answers, Page 15

Question list
Search

Related questions











Question 141

Report
Export
Collapse

Examples of Mistake Proofing for a laptop computer include which of these? (Note: There are 2 correct answers).

USB connection for a mouse
USB connection for a mouse
Open/Close button for CD Drive
Open/Close button for CD Drive
Battery alignment pins
Battery alignment pins
On/Off switch for computer
On/Off switch for computer
Suggested answer: A, C
asked 23/09/2024
ayodele fakayode
35 questions

Question 142

Report
Export
Collapse

Significant variation in process performance is a consequence of several causes that can be classified using terminologies shown here. (Note: There are 2 correct answers).

Common
Common
Random
Random
Uneducated
Uneducated
Special
Special
Vital
Vital
Suggested answer: A, D
asked 23/09/2024
Said Bouzardaoui
38 questions

Question 143

Report
Export
Collapse

The reason(s) for not marking the customer Specification Limits (SL) on a Control Chart is which of these? (Note: There are 4 correct answers).

Process control teams should not control a process based on SLs
Process control teams should not control a process based on SLs
Displaying the SLs on a Control Chart sends a wrong signal toward process control
Displaying the SLs on a Control Chart sends a wrong signal toward process control
Marking the SLs on a Control Chart is against the principle of charting
Marking the SLs on a Control Chart is against the principle of charting
By marking the SLs, one can confuse the operator as to what limits are critical
By marking the SLs, one can confuse the operator as to what limits are critical
By using mere Control Limits the process only needs to be in Statistical Control
By using mere Control Limits the process only needs to be in Statistical Control
Suggested answer: A, B, D, E
asked 23/09/2024
Ana Rosa Abascal Ortega
39 questions

Question 144

Report
Export
Collapse

A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.

True
True
False
False
Suggested answer: A
asked 23/09/2024
Michael Serda
36 questions

Question 145

Report
Export
Collapse

SPC charts typically have the most recent data point on the right hand side.

True
True
False
False
Suggested answer: A
asked 23/09/2024
karl hickey
42 questions

Question 146

Report
Export
Collapse

Which of these statements describe an undesirable situation when implementing SPC? (Note: There are 2 correct answers).

The lower Control Limit for the R chart is equal to zero
The lower Control Limit for the R chart is equal to zero
The Control Limits are wider than the customer specification limits
The Control Limits are wider than the customer specification limits
A process is in Statistical Control before implementation of SPC
A process is in Statistical Control before implementation of SPC
Attempt to use SPC for tracking transaction times at a warehouse
Attempt to use SPC for tracking transaction times at a warehouse
Indication of the specification limits on the Control Chart
Indication of the specification limits on the Control Chart
Suggested answer: B, E
asked 23/09/2024
Pouyan Bani Shahabadi
32 questions

Question 147

Report
Export
Collapse

If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?

Individual-Moving Range
Individual-Moving Range
Xbar-R Charts
Xbar-R Charts
Xbar-S Charts
Xbar-S Charts
nP and P Charts
nP and P Charts
Suggested answer: B
asked 23/09/2024
Batista Moreira
38 questions

Question 148

Report
Export
Collapse

After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?

Moving Average Chart
Moving Average Chart
Multi-Vari Chart
Multi-Vari Chart
X bar Chart
X bar Chart
Pareto Chart
Pareto Chart
Suggested answer: A
asked 23/09/2024
Richard Drayer Camacho
37 questions

Question 149

Report
Export
Collapse

A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?

Never, a Control Plan is a living document
Never, a Control Plan is a living document
As soon as the Champion signs off
As soon as the Champion signs off
Within 30 days of the LSS project review team meeting
Within 30 days of the LSS project review team meeting
After the project has been presented at the recognition event
After the project has been presented at the recognition event
Suggested answer: A
asked 23/09/2024
Donnie Roach
29 questions

Question 150

Report
Export
Collapse

Six Sigma refers to a process whose output has at least 80% of its data points within +/- 6 Standard Deviations from the Mean.

Become a Premium Member for full access
  Unlock Premium Member
Total 200 questions
Go to page: of 20