HOTSPOT
You need to configure the warehouse manager's ModelA subassembly production requirements. Which setting should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to resolve the ModelT issue reported by the golf course manager.
Which two features should you configure? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
Service subscription
Counter-based maintenance plan lines
Maintenance plan lines for the location
Service type item
Time-based maintenance plan lines
HOTSPOT
You need to configure the two lift kit subassembly cost requirements for production.
Which methods should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
HOTSPOT
A company uses a make-to-stock strategy for their key production components.
The number of active Kanban's for these components must be constant.
You need to configure a new Kanban rule.
How should you set up the Kanban type and replenishment strategy? To answer select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
A company produces generic and name-brand paper plates in the same factory using standard costing and unrig the same Bill of materials and routes to produce both product.
The finance and production teams want a way to new individual raw material consumption costs in the ledger.
You need to add a production group to tie finished good to control postings to the ledger. What should you do?
Update the cost of the generic finished good item.
Create a production pool tor the finished good item.
Create a production group for the finished good item.
Create a new Bill of materials with alternate cons for the raw material.
HOTSPOT
A company plans to implement routing and route postings.
You must direct positing of route cards based upon the route group at Report as finished. You set the start default order for route posting to Never and the Report as finished to Route Group Dependent.
You set up the route group as shown below.
Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection it worth one point.
DRAG DROP
You are a manufacturer using Druitt 365 Supply Cham Management
A new series of orders is authorized for production.
You need to identify which documents to use for the released production order.
Which document should you use tor each requirement? to answer drag the appropriate documents to the correct requirements. Each document nay be used once more than once. or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
A manufacturing plant uses lean manufacturing Operators process Kanban consumption manually using a mobile device.
The production team must use automatic empty registration for some of the event. Unbars Registration must occur when the last job of a Kanban is completed.
You need to update the Kanban rule to meet this requirement.
What Kanban should you update?
Set a fired Kanban quantity.
Select to register as empty when handling units are received.
Select to register as empty when the source requirement is registered.
Select to manually register as empty
DRAG DROP
A recreational vehicle (RV) manufacturing company is implement Dynamics 365 Supply Chain Management. All RVs are configured to order.
Quality checks show that there is an issue with the sealant used with the windows in some of the RVs.
You need to identify which RV models use the sealant and change the sealant item.
Which function should you use for each requirement? To answer, drag the appropriate functions to the correct requirements. Each function may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
You are the lead product design engineer at a plastics manufacturing company.
You implement a new process that uses a single to produce three finished at the same time.
You need to set up the planning items number and formula to correctly to manufacturing the tree items.
Which three actions should you perform? Each correct answer presents part of the solution.
Assign co-production to the formula.
Specify each of the finished good items as co-products.
Create item number for planning item and the associated formula.
Add a coverage group to the formula.
Add minimum and maximum quantities on formula.
Question