DRAG DROP

A company uses the asset management module in Dynamics 365 Supply Chain Management.

A machine on the shop floor is noisy and emitting and odd smell. The shop floor manager must alert the repair team that the asset might require a repair, or a series of repairs, by one or more specialized repair technicians. All repair records must tie back to the initial investigation records in case of a safety audit.

You need to create components to initiate the process of tracking the requests.

Which three actions should you perform in sequence? To answer. More the appropriate actions from the list of actions to the answer to the answer area and arrange them in the correct order.


Question 101
Correct answer: Question 101

A co uses the asset management module in Supply Cham Management. The company has four conveyer systems in the warehouse. A robotic crane moves pallets of products to its conveyer int. Each robotic crane and conveyer line is considered a multilevel asset.

A work order arrives for a conveyer system. A technician completing the work observes that the robotic crane needs a repair. The technician is not qualified to work on the robotic crane.

You need to ensure that the robotic is repaired.

Which two options should you configure? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A.

Calculate capacity load with the level field set to 0.

A.

Calculate capacity load with the level field set to 0.

Answers
B.

Create a related work order.

B.

Create a related work order.

Answers
C.

Update the work order Lifecycle state.

C.

Update the work order Lifecycle state.

Answers
D.

Create a manual work order.

D.

Create a manual work order.

Answers
E.

Calculate capacity load with the level field set to 1.

E.

Calculate capacity load with the level field set to 1.

Answers
Suggested answer: B, D

HOTSPOT

A company uses Dynamics 365 Supply Chain Management.

The company wants to use the distributed hybrid topology model to alleviate performance issues at some of its distribution centers. The company has a manufacturing plant, PlantA, which resides at the same physical location as the company home office in FranlFurt Germany.

The company has the following distribution locations:

* Distribution1 covers Ireland.

* Distribute covers the United Kingdom.

* Distribution convers Belgium Germany, and the Netherlands

* Distribution5 covers the Shetland islands.

All distribution warehouses use Dynamic 365 Supply Chain Management to receive and distribute goods from PlantA.

Wherehouse personal use the warehouse app to perform their job function. Because of their proximity to each other, Distribution1, 2, and 3 are managed together and frequently transfer goods between each location.

Due to several connection issues with Dynamic 365 Supply Chain Management, the Shettland islands location struggles to perform tasks.

The company must maintain as little of its own IT infrastructure as possible, especially in remote areas, but still daily activities at all locations.

You need to recommend the appropriate topology configuration.

Which type of scaled should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.


Question 103
Correct answer: Question 103

DRAG DROP

A company uses Asset management in Dynamics 365 Supply Cham Management. The company also uses Dynamics 365 Guides independently of the Dynamics 365 Supply Chain Management implementation.

Maintenance workers requite a checklist template to complete work orders. A solution must help the workers through work order steps. The solution must use Dynamics 365 Guides with Dynamics 365 Supply Chain Management.

You need to integrate the solution.

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.


Question 104
Correct answer: Question 104

Explanation:

Create a maintenance checklist template in Dynamics 365 Supply Chain Management.

Create a guide of the mainetnance checklist process in the Dynamics 365 Guides PC app.

Assign a guide to the template field on the maintenances checklist template record.


A company uses Dynamics 365 Supply Chain Management. Equipment installations in multiple regional locations require monthly maintenance.

Two maintenance technicians have holiday time off scheduled this month.

You need to ensure that all scheduled work orders are completed within the month around the holiday schedules.

Which feature should you use?

A.

Capacity toad calculation

A.

Capacity toad calculation

Answers
B.

Operations scheduling

B.

Operations scheduling

Answers
C.

Activity-based subcontracting

C.

Activity-based subcontracting

Answers
D.

Planning optimization

D.

Planning optimization

Answers
E.

Job scheduling

E.

Job scheduling

Answers
Suggested answer: E

DRAG DROP

You are the product manager at an orange juice manufacturing company.

For every 1.000 pounds of orange juke, 20 pounds of orange pulp is created which can be sold or reused profitably. The cost is calculated as a weighted average between the quantity of orange juice that is reported as finished and the orange pulp based on the standard cost of each item.

You need to create the formula for orange juice that will produce orange pulp as a result of finishing a batch order.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Question 106
Correct answer: Question 106

Explanation:

Create a new formula an formula version for orange juice.

Add a co-product line for orange pupl and enter...

Set Total cost allocation on the header to true.

Select TCA as the co-product cost allocation.


DRAG DROP

You are the product definition manager for a car manufacturing company. You set up and maintain the production configuration models used at the company.

You must build a new configuration model and Include Constraints in the model.

You need to determine winch constraint type to use tor each scenario.

Which constraint type should you use? To answer, drag the appropriate constraint types to the correct scenarios. Each constraint type may be used once, more than once, or not at all You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point


Question 107
Correct answer: Question 107

A company produces multiple products that require an installation kit that includes 50 components.

The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOW kit that includes all SO components, but you do not want it to produce a separate production order.

You need to set up the product BOM for the finished good.

What should you do?

A.

Select Phantom on the engineering fast tab on the kit item.

A.

Select Phantom on the engineering fast tab on the kit item.

Answers
B.

Change the coverage group on the kit item to Manual.

B.

Change the coverage group on the kit item to Manual.

Answers
C.

Change the line type to Pegged supply

C.

Change the line type to Pegged supply

Answers
D.

Change the line type to Phantom

D.

Change the line type to Phantom

Answers
Suggested answer: A

HOTSPOT

A discrete manufacturer uses Dynamics 365 Supply Cham Management for time and attendance registrations on the shop floor.

Production worker A and production worker 8 clock in at 7 AM. They clock out at different times. Their work schedules are shown in the following table.

You need to determine how the current configuration will book the time.

What is logged in the system for each worker? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.


Question 109
Correct answer: Question 109

A manufacturing company uses master planning in Dynamics 365 Supply Chain Management.

The production planner increases the lead time of an item. On the next master planning output the planner receives a cancel action message on existing purchase orders. The message includes a suggested earlier date for the planned purchase orders.

The demand for the item has not changed since the original purchase order was placed. Dynamic negative days is not used.

You need to resolve the issue.

What should you do?

A.

Increase positive days.

A.

Increase positive days.

Answers
B.

Decrease positive flays.

B.

Decrease positive flays.

Answers
C.

Decrease negative days to be less than the item lead time.

C.

Decrease negative days to be less than the item lead time.

Answers
D.

Increase negative days to be greater than the item lead time.

D.

Increase negative days to be greater than the item lead time.

Answers
Suggested answer: B