HOTSPOT
A company implements Dynamics 365 Supply Cham Management.
You need to ensure that cost roll-ups and sales price calculations are configured for the scenario. Which options should you use? To answer select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
DRAG DROP
A company is implementing Dynamics 365 Supply Chain Management The company is a subcontractor that produces subassemblies for two major customers. CustomerA and Customers
The company prioritizes CustomerA production orders to start on Mondays. The production orders may take several days to complete. Customers' orders are produced throughout the week, after CustomerA orders are completed. Work in process (W1P) must be calculated and consolidated for CustomerA and CustomerB respectively on the financial reports.
You need to configure the production requirements.
What should you configure? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
You maintain responsible resource calendars and production orders for a manufacturing company. All production resources use the same production calendar.
A machine in the facility is defective and must be closed for repairs for the next two days.
You need to configure the resource calendar to close the resource for production for the next two days.
What should you do?
Navigate to the resource. Change the calendar 10 closed on the resource.
Navigate to the calendar used for production and close the next two days.
Navigate to the resource. Configure a calendar deviation to set the calendar to closed for the next two days.
Navigate to the resource group. Change the calendar to closed on the resource group.
DRAG DROP
A manufacturing company uses Dynamics 365 Supply Cham Management The company operates three eight-hour shifts per day. Monday through Friday.
The company purchased equipment for a new process that cannot be performed with easting equipment. This specialized equipment performs only this unique task. The machinery must always be monitored and controlled by a worker.
The machine must be added to the existing production line and be ready as soon as possible. Future planned production orders must not overload the running maximums of the new machine.
You need to configure the system.
Which four actions must you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
You are the lead product design manage at a Process manufacturing plant.
A formula that produces egg yolks as a by-product. This by-product is added back into inventory at standard cost and can be used in other production batches.
You need to select the by-product cost allocation.
Which cost allocation type should you use?
Per series
Per quantity
Percent
Recycled
HOTSPOT
A company that assembles packaging material uses Dynamics 36S Supply Cham Management.
The glue that is used in assembly has run out of stock and will not be back in stock as expected. Another adhesive must be substituted for the glue. This will affect orders in planning as well as production orders that have started.
You need to ensure that the substitute adhesive is used in production until the glue is back in stock.
Which configuration should you use for each requirement? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection Is worth one point.
DRAG DROP
A manufacturer uses route operations and job scheduling. You use a unique calendar for a conveyor line.
The company observes a decrease in the number of hours a conveyor line resource is operational due to breakdowns. You must make a temporary change to the number of hours the resource is available.
You need to adjust the efficiency percentage for the conveyor line calendar.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
A company configures master planning to order large and expensive aluminum sheets that are only available at certain times of the year.
The warehouse manager reports that replenishment levels are too high, causing inventory value to be over budget. In addition, the aluminum sheets take up too much space on the shop floor.
You need to configure the appropriate replenishment method.
Which coverage dimension should you use?
Pet requirement
Manual
Min/Wax
Pet period
DRAG DROP
A skateboard manufacturer uses route operations to schedule resources and estimate units per hour. All products use the same sub assembly item and resource sanding process.
You observe an Increase in the number of units a sanding belt resource can produce. The production schedule is now inaccurate due to the number of units the sanding belt line can produce. You must make a permanent change to the number of units the resource can produce for all future orders.
You need to adjust the process quantity on the route operation.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.
Break times are paid. The cost of a break time must be charged at the pay rate of the job in progress when the break starts.
You need to configure the break times to charge against the job in progress.
Which two actions should you perform? Each answer presents a partial solution.
NOTE; Each correct selection is worth one point.
Set Production Order Cost Category to Yes.
Set Direct Payroll Cost Standard Time to Allocate.
Set Production Order Cost Category to No.
Set Direct Payroll Cost Standard Time to Yes.
Set Direct Payroll Cost Standard Time to No.
Question