List of questions
Related questions
Question 54 - 500-443 discussion
What are two conditions in which PCS legs get invoked? (Choose two.)
If Router Re-query is misconfigured and the Ring-No-Answer timeout expires, the caller is still transferred to the Post Call Survey DN. This can occur if a Queue node is used and Enable target requery is checked.
The Post Call Survey DN is called if the Unified CVP has received at least one CONNECT message from CCE (either from the VRU leg or the Agent's leg). Use the END node in the CCE routing script if the Post Call Survey is not required for the calls disconnected from the IVR.
If Router Re-query is misconfigured and the Ring-No-Answer timeout expires, the caller is still transferred to the Post Call Survey DN. This can occur if a Queue node is used and Enable target requery is not checked.
The Post Call Survey DN is called if the Unified CVP has received at least one CONNECT message from CCE (either from the VRU leg or the Agent's leg). Use the Release node in the CCE routing script if the Post Call Survey is not required for the calls disconnected from the IVR.
The correct call route is configured through the Call Manager server.
0 comments
Leave a comment first