Question 1

For FusionModule2000, depending on different layout position, batteries can be deployed in the smart module or out of the smart module.
Question 2

After all historical alarms of the NetCol5000-A are deleted, the deletion operation is not logged.
Question 3

Commissioning NetCol5000-C drainage devices, after lifting the high float for 5 seconds, two water pumps start working, and the drain abnormal alarm is generated.
Question 4

The UPS can generate large leakage currents. A circuit breaker equipped with a residual current device (RCD) is not recommended. If leakage protection is required, consider the leakage current of the UPS and downstream devices.
Question 5

As the altitude increases, the air density decreases, and the heat exchange capability of the air in a unit volume decreases. In this case, NetCol8000-E220 works with derating.
Question 6

When connecting chilled water pipes for the NetCol8000-C, fill water and preserve pressure 8 hours after the conversion adapter is connected.
Question 7

The UPS5000-E-200K works in normal mode. If two ECMs are faulty, how does the UPS work?
Question 8

Refer to the exhibit.
Question 9

When installing a water-cooled module, what is the minimum distance between the module and the wall?
Question 10

On the ECC800-Pro WebUI, which of the following is the first-level menu of the NMS Application?