HOTSPOT

A bicycle manufacturing company is implementing Dynamics 365 Supply Chain Management.

The warehouse must pick and stage parts other than paint for bicycle assembly. Paint is at the production station.

You need to configure the reservations for production.

What should you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Question 51
Correct answer: Question 51

A manufacturer is implementing Dynamics 365 Supply Chain Management with warehouse management processes (WMS).

Warehouse workers use hand-held devices to pick and stage batch-tracked products for production. The warehouse manager requires that products are removed from on-hand inventory and consumed when they are picked and staged for production.

You need to remove the products from on-hand inventory.

What should you configure?

A.

mobile device menu item, start production order

A.

mobile device menu item, start production order

Answers
B.

flushing principle, available al location

B.

flushing principle, available al location

Answers
C.

flushing principle, start

C.

flushing principle, start

Answers
D.

manufacturing execution, job card device

D.

manufacturing execution, job card device

Answers
Suggested answer: C

Explanation:

The flushing principle is a setting that determines how and when the raw materials are consumed from inventory and registered as work in progress (WIP) for production orders and batch orders1.The flushing principle can be configured at the product level, the bill of materials (BOM) or formula line level, or the production order or batch order line level1.

The Start flushing principle indicates that the material will be automatically consumed when the production order is started1. The amount of material that is consumed is proportional to the quantity that is started.This principle is relevant if, for example, the variance in the consumption is low, the materials are low-value materials, there are no tracking requirements, or there's a short run time on operations1.

In this scenario, the warehouse manager requires that products are removed from on-hand inventory and consumed when they are picked and staged for production. Therefore, the Start flushing principle should be configured for the batch-tracked products. This way, the products will be deducted from inventory and set to WIP as soon as the production order is started on the hand-held device.

DRAG DROP

A manufacturer is implementing Dynamics 365 Supply Chain Management to create blends of oil and industrial lubricant.

The manufacturer requires detailed documentation for the production order process before manufacturing begins for the products. The shop floor must review, approve, and anticipate all production runs. Before production starts, the manufacturer wants to ensure that the order can be completed by a certain timeframe based on capacity.

You need to define the production life cycle stages.

Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Question 53
Correct answer: Question 53

A company uses Dynamics 365 Supply Chain Management.

The marketing group needs to be able to view a manufacturer's suggested retail price (MSRP) for a new bill of materials (BOM) item when the cost of the BOM item is calculated.

You need to configure the functionality.

What should you do?

A.

Set the sales price model field on the calculation group to item sales price.

A.

Set the sales price model field on the calculation group to item sales price.

Answers
B.

Use the category price rules to generate a trade agreement with the sales price.

B.

Use the category price rules to generate a trade agreement with the sales price.

Answers
C.

Add a profit setting percentage to a calculation group.

C.

Add a profit setting percentage to a calculation group.

Answers
D.

Add a profit setting percentage to the released BOM product.

D.

Add a profit setting percentage to the released BOM product.

Answers
E.

Add a profit setting percentage to a cost group.

E.

Add a profit setting percentage to a cost group.

Answers
Suggested answer: B

Explanation:


DRAG DROP

A company overstates on-hand raw materials due to the time it takes to post raw materials as consumed when production orders are processed.

All items used to manufacture finished goods must be consumed when a finished good is reported as finished. You must not change all bill of materials lines to use the option of flushing principal.

You need to ensure that all production orders consume raw materials at Report as finished.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

In the Production order status section of Production control, select Start

In the Picking list journal, select Always in the Automatic BOM consumption

In the Production order status section of Production control, select Report as finished

Select Make default for all users

https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/production-parameters-manufacturing-execution

Question 55
Correct answer: Question 55

Explanation:

https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/production-parameters-manufacturing-execution

A company produces paints and assembles bicycle frames.

You must account for paint drying time before assembly operations can begin.

You need to set up the operation to encompass queue times.

Which two options can you use? Each correct answer presents pad of the solution.

NOTE: Each correct selection is worth one point.

A.

Build capabilities for each resource related to color.

A.

Build capabilities for each resource related to color.

Answers
B.

Enter a value in the queue time after field for the painting operation.

B.

Enter a value in the queue time after field for the painting operation.

Answers
C.

Enter a value in the transit time on the painting operation.

C.

Enter a value in the transit time on the painting operation.

Answers
D.

Make a resource group for each size and color and assign that group to the operation.

D.

Make a resource group for each size and color and assign that group to the operation.

Answers
E.

Enter a value in the queue time before field for the assembly operation.

E.

Enter a value in the queue time before field for the assembly operation.

Answers
Suggested answer: B, E

Explanation:

Queue time is the time that a job waits at a work center before or after the job is processed1. You can use queue time to account for paint drying time before assembly operations can begin.You can specify queue time in minutes, hours, or days on the route operations that are attached to the production order2.

To set up the operation to encompass queue times, you should do the following:

Enter a value in thequeue time afterfield for the painting operation.This value indicates how long the painted bicycle frames must wait at the painting work center before they can be moved to the next operation2. For example, if the paint drying time is 24 hours, you can enter 24 in the queue time after field and select Hours as the unit.

Enter a value in thequeue time beforefield for the assembly operation.This value indicates how long the painted bicycle frames must wait at the assembly work center before they can be processed2. For example, if there is a delay between the arrival of the frames and the start of the assembly, you can enter a value that reflects this delay in the queue time before field and select the appropriate unit.

The other options are not correct, because they do not involve queue times. Building capabilities for each resource related to color would allow you to assign resources based on their color proficiency, but it would not account for paint drying time. Entering a value in the transit time on the painting operation would indicate how long it takes to move the painted bicycle frames from one work center to another, but it would not include the waiting time before or after the movement. Making a resource group for each size and color and assigning that group to the operation would allow you to group resources that have similar characteristics and can be used interchangeably in production, but it would not affect the queue times.

1:Queue times2:Set up operations scheduling

DRAG DROP

A company plans to account for indirect costs related to materials used to manufacture products.

The items used to manufacture products have surcharge rates that depend on the type of product being used.

You need to set up the costing sheet to include surcharges for specific items.

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Question 57
Correct answer: Question 57

DRAG DROP

A manufacturing company is implementing Dynamics 365 Supply Cham Management.

Bill of materials (BOMs) must be calculated using standard cost principles.

Miscellaneous charges must be included in the unit cost price. The explosion mode must arways be enforced as single level.

You need to configure the system to meet the requirements.

Which configuration should you enable for each requirement? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Question 58
Correct answer: Question 58

A company produces pipe at certain fixed lengths.

The company must be able to schedule cutting machines. You set up the cutting machines as resources. AH cutting resources can produce many of the products. There are some products that require cutting machines that can produce longer lengths of product. Only some of the machines can do this.

You need to configure the resources to account for these different products.

What should you do?

A.

Build capability related to length and assign to the appropriate resources.

A.

Build capability related to length and assign to the appropriate resources.

Answers
B.

Configure the Data/Hour option on the Capacity unit field on the resource.

B.

Configure the Data/Hour option on the Capacity unit field on the resource.

Answers
C.

Create a resource for each length.

C.

Create a resource for each length.

Answers
D.

Create a resource group for each length.

D.

Create a resource group for each length.

Answers
Suggested answer: A

HOTSPOT

A manufacturer uses Dynamics 365 Supply Chain Management to create bicycle parts as a configure-to-order configuration. All bicycle parts are sourced from external sources and assembled in the manufacturing facility.

The manufacturer plans to expand its capabilities to create custom bicycles parts in an engineer-to-order model. All bicycle parts will be created in the manufacturing facility. The custom bicycle parts must be omitted from any master planning process.

You need to describe the concepts for the requirements.

Which concepts should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Question 60
Correct answer: Question 60
Total 152 questions