Question 41

You need to address the ignition switch issue.
Which three actions should you perform? Each answer presents part of the solution.
NOTE: Each correct selection is worth one point.
Question 42

A company produces homeopathic lotions for pain relief. The lotions use a combination of ProductA and ProductB. ProductA is the primary ingredient. You use Products to adjust the concentration of active ingredients in the lotion. ProductC represents the remainder.
You need to ensure that the lotion final product has a consistent concentration of anti-inflammatory agents.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
Question 43

HOTSPOT
A company makes engine parts used in the automotive industry.
They are in the process of retooling an existing manufacturing plant. They are looking to use Dynamics 365 for Finance and Operations to help support the Bill of Materials (BOM) product lifecycle for engineering version control.
You must translate existing production processes into the proper elements. You need to create BOM lifecycle states to translate existing production processes into the proper elements.
What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.
Question 44

A company uses engineering change management in Dynamics 365 Supply Chain Management. The Product readiness checks feature is turned off.
An existing engineering product must be reconfigured for a new product readiness policy.
You need to change the product readiness policy.
Where should you make this change?
Question 45

You are building the Bill of materials (BOM) for a new production item. The new item has a subcomponent.
Subproduction orders for the subcomponent must be created when estimating production orders.
You need to configure the BOM line to generate sub production orders.
Which BOM line type should you use?
Question 46

HOTSPOT
You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.
You need to set up a new item for the car audio system.
How should you create the new product? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Question 47

DRAG DROP
A company produces custom-made bicycles that offer many different configurations.
Your standard bicycle, B-0001, is made with many common components such as a frame and wheels. Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.
You create the following configuration groups: Frames, Wheels
You need to ensure that users can only select valid combinations of frames and wheels.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
Assign the Frames and Wheels configuration..
Create a new Bill of materials version..
Add the Frames and Wheels configuration groups to the configuration route
Configure the two bicycle configurations
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration
Question 48

You work for a gem wholesaler that sells raw diamonds. Diamonds are purchased and sold in individual boxes but weighed and inventoried in carats.
You are setting up a catch weight item for diamonds. Each box of diamonds must be tracked by its individual container weight.
You need to set up this item as a full visibility catch weight item.
Which two steps must you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
Question 49

You are the production supervisor in charge of setting effective cost prices for the labor force in a manufacturing company.
It is the end of the year and the labor rates have been recalculated based on new salary data.
You need to update the effective labor costs for all labor groups.
Which element must be updated?
Question 50

HOTSPOT
You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish.
You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.
You have set up the default Start user options for all production orders as shown in the exhibit below.
Question