ExamGecko
Home / Nutanix / NCS-Core / List of questions
Ask Question

Nutanix NCS-Core Practice Test - Questions Answers, Page 5

List of questions

Question 41

Report Export Collapse

An administrator is supporting a business critical environment and deploys metro availability to achieve a zero data loss configuration. The two clusters are connected by a 1GbE connection. A new workload is going to be deployed to this cluster. This workload requires a sustained 150MB/S of write throughput and 20MB/s of read throughput.

Which change must be made to deploy the workload successfully on this cluster?

The bandwidth must be increased to support this workload.
The bandwidth must be increased to support this workload.
The workload must be configured to read at greater than 12.5MB/S.
The workload must be configured to read at greater than 12.5MB/S.
The replication frequency must be less than 60 minutes.
The replication frequency must be less than 60 minutes.
Zero data loss nearsync must be used to support this workload.
Zero data loss nearsync must be used to support this workload.
Suggested answer: A
Explanation:

Ref:

Nutanix NCS-Core image Question 41 explanation 82011 09232024013105000000

asked 23/09/2024
Ricardo de SÑ Carvalho
44 questions

Question 42

Report Export Collapse

A systems administrator needs to add more VMs to their Nutanix cluster.

Which two actions should the administrator perform to determine if the current cluster can accommodate the new VMs? (Choose two.)

Perform an Inventory with Life Cycle Management.
Perform an Inventory with Life Cycle Management.
Determine utilization with Cluster Runway.
Determine utilization with Cluster Runway.
Enable Deduplication and Erasure Coding.
Enable Deduplication and Erasure Coding.
Utilize Optimize Resources for VM efficiency.
Utilize Optimize Resources for VM efficiency.
Suggested answer: B, D
Explanation:

Ref:

Nutanix NCS-Core image Question 42 explanation 82012 09232024013105000000

asked 23/09/2024
Sukhpreet Sidhu
44 questions

Question 43

Report Export Collapse

A guest VM is reported to have poor storage performance. It has an I/O profile of 80% read. 20% write, and the HDDs form more than 50% of the read source.

What should an administrator do to resolve this issue?

Increase SSD capacity
Increase SSD capacity
Increase the OPLOG
Increase the OPLOG
Increase the write cache
Increase the write cache
Use HDDs with higher RPM
Use HDDs with higher RPM
Suggested answer: A
Explanation:

Ref: https://portal.nutanix.com/page/documents/solutions/details?targetId=BP-2126-SAS-on-Nutanix:BP-2126-SAS-on-Nutanix

asked 23/09/2024
ce temp2
51 questions

Question 44

Report Export Collapse

An administrator receives an alert in Prism indicating that interface eth2, on an AHV host is receiving many CRC errors. After togging into the problematic host, the following command is run to show the indicated output:

Nutanix NCS-Core image Question 44 82014 09232024013105000000

What is causing this issue?

Incorrect link speeds on the switch
Incorrect link speeds on the switch
The interface is incorrectly configured with Jumbo Frames
The interface is incorrectly configured with Jumbo Frames
A misconfigured bond
A misconfigured bond
A physical layer network problem
A physical layer network problem
Suggested answer: B
Explanation:

Ref:

rx_crc_errorsare caused either by faults in layer 1 (in the past, we have seen failed twinax cables and incorrect types of fibre being used), or issues with jumbo frames on the network. In an environment with 10 Gig switches that use cut-through forwarding (Cisco Nexus, Arista, Cisco devices using IOS default to Store and Forward switching), any packets that come into the switch will get forwarded out the destination interface once the switch has read the destination MAC address. If that packet has an MTU over what is configured on the interface, it will cut off the packet at the designated MTU, causing the server to receive a malformed packet, which will throw a CRC error.

If you have a layer 1 issue, you will seerx_crc_errors,not on all but one or two nodes.

asked 23/09/2024
Kishen Morar
51 questions

Question 45

Report Export Collapse

An administrator deletes a large amount of data from a Volume Group presented to a Linux VM. The administrator notices that the deleted data has not been reclaimed as usable storage.

What action should be taken to reclaim the storage capacity?

Shrink the Volume Group that is associated with the Linux VM
Shrink the Volume Group that is associated with the Linux VM
Unmount the Volume Group and then Remount the Volume Group
Unmount the Volume Group and then Remount the Volume Group
Enable the unman operation on the Linux VM
Enable the unman operation on the Linux VM
Run Defrag on the Linux VM
Run Defrag on the Linux VM
Suggested answer: B
Explanation:

https://next.nutanix.com/how-it-works-22/vm-capacity-and-prism-capacity-are-different-33134

asked 23/09/2024
Ian Schraier
42 questions

Question 46

Report Export Collapse

A customer has two mission-critical applications and needs to have them backed up to a remote location. The remote location is connected using a leased line and has an average latency of 7 ms.

Which Nutanix technology will provide the shortest RPO possible?

NearSync
NearSync
Leap
Leap
Metro Availability
Metro Availability
Asyn&DR
Asyn&DR
Suggested answer: B
Explanation:

Ref: https://portal.nutanix.com/page/documents/solutions/details?targetId=BP-2005_Data_Protection:BP-2005_Data_Protection

asked 23/09/2024
Mpho Ntshontsi
50 questions

Question 47

Report Export Collapse

An administrator needs to deploy an application with a large amount of data connected via Nutanix Volumes.

Which two actions should the administrator take when designing the Volume Group? (Choose two.)

Use multiple subnets for iSCSI traffic
Use multiple subnets for iSCSI traffic
Enable RSS (Receive Side Scaling)
Enable RSS (Receive Side Scaling)
Enable thick provisioning on the Volume Group(s)
Enable thick provisioning on the Volume Group(s)
Distribute workload across multiple virtual disks
Distribute workload across multiple virtual disks
Suggested answer: B, D
Explanation:

Nutanix NCS-Core image Question 47 explanation 82017 09232024013105000000

asked 23/09/2024
Christian Weber
42 questions

Question 48

Report Export Collapse

Microsegmentation was recently enabled in a Nutanix environment. The administrator wants to leverage Prism Central to create a policy that will block all traffic, regardless of direction, between two groups of VMs identified by their category.

Which policy should be used to meet this requirement?

A Quarantine Policy
A Quarantine Policy
An Isolation Environment Policy
An Isolation Environment Policy
An Application Security Policy
An Application Security Policy
A Whitehst-Based Policy
A Whitehst-Based Policy
Suggested answer: B
Explanation:

Nutanix NCS-Core image Question 48 explanation 82018 09232024013105000000

asked 23/09/2024
Lin Joel
30 questions

Question 49

Report Export Collapse

An administrator configures authentication in Prism Central (PC) for the NTNX-Admins group. Users report that they are unable to log in. The administrator confirms that the Active Directory (AD) settings in PC are correct.

Which condition could result in this behavior?

A role mapping needs to be associated with the AD group.
A role mapping needs to be associated with the AD group.
The users must be added to the Domain Admins AD group.
The users must be added to the Domain Admins AD group.
The Local authentication type must also be selected in PC.
The Local authentication type must also be selected in PC.
A client chap certificate must also be added in PC.
A client chap certificate must also be added in PC.
Suggested answer: B
Explanation:

Ref: https://portal.nutanix.com/page/documents/details?targetId=Prism-Central-Guide-Prism-v5_10:mul-security-role-permissions-pc-t.html

asked 23/09/2024
Karine Bashala
31 questions

Question 50

Report Export Collapse

An organizations Nutanix Cluster is based on VMware vSphere. The cluster is configured to download software updates automatically. The administration needs to verify and eventually upgrade VMware hypervisor via Prism Ul.

After logging in to Prism, the administrator receives the message shown:

No available versions for upgrade

What is causing the current state?

VMware support has expired, so downloads are not available.
VMware support has expired, so downloads are not available.
vSphere binaries need to be manually uploaded.
vSphere binaries need to be manually uploaded.
The environment is running the latest vSphere version, so no update is required.
The environment is running the latest vSphere version, so no update is required.
The cluster is unable to connect to reIease-api.nutanix-ccm:8D.
The cluster is unable to connect to reIease-api.nutanix-ccm:8D.
Suggested answer: C
Explanation:

ref: https://portal.nutanix.com/page/documents/details?targetId=Web-Console-Guide-Prism-v510:upg-hypervisor-upgrade-esxi-c.html

asked 23/09/2024
Tobias Wartenweiler
40 questions
Total 302 questions
Go to page: of 31
Search

Related questions