Cisco 010-151 Practice Test - Questions Answers, Page 5

Question list
Search
Search

What is the correct path to verify the Overall Status of Chassis 1 | Server 3?

A.

Equipment Tab > Chassis > Chassis 1 > Servers > Server 3 Status tab

A.

Equipment Tab > Chassis > Chassis 1 > Servers > Server 3 Status tab

Answers
B.

Equipment Tab > Chassis > Chassis 1 > Servers > Server 3 General tab

B.

Equipment Tab > Chassis > Chassis 1 > Servers > Server 3 General tab

Answers
C.

Equipment Tab > Chassis > Chassis 1 > Servers > Server 3 FSM tab

C.

Equipment Tab > Chassis > Chassis 1 > Servers > Server 3 FSM tab

Answers
D.

Servers Tab > Chassis > Server 3 General tab

D.

Servers Tab > Chassis > Server 3 General tab

Answers
E.

Status Tab > Chassis > Chassis 1 > Servers > Server 3

E.

Status Tab > Chassis > Chassis 1 > Servers > Server 3

Answers
F.

Admin Tab > Chassis > Chassis 1 > Servers > Server 3 General tab

F.

Admin Tab > Chassis > Chassis 1 > Servers > Server 3 General tab

Answers
Suggested answer: B

If the Overall Status for a Cisco UCS B-Series Blade Server indicates a failure in the Cisco UCS Manager, such as discovery-failed, which statement is true?

A.

The server shuts down.

A.

The server shuts down.

Answers
B.

The server automatically reboots reboot in 3 minutes.

B.

The server automatically reboots reboot in 3 minutes.

Answers
C.

The endpoints on that server cannot be upgraded.

C.

The endpoints on that server cannot be upgraded.

Answers
D.

The server is online, but the administrator cannot assign a service profile to that blade.

D.

The server is online, but the administrator cannot assign a service profile to that blade.

Answers
Suggested answer: C

Which action should the administrator take before physically removing a blade server for maintenance or replacement?

A.

Force the server to shut down.

A.

Force the server to shut down.

Answers
B.

Disassociate the service profile.

B.

Disassociate the service profile.

Answers
C.

Decommission the server.

C.

Decommission the server.

Answers
D.

Perform a graceful shutdown of the server.

D.

Perform a graceful shutdown of the server.

Answers
Suggested answer: C

Which three statements about powering down a Cisco UCS C-Series Rack-Mount Server to perform maintenance or replacement are true? (Choose three.)

A.

Standby power mode: Power is supplied only to the service processor and the cooling fans, and it is safe to power off the server from this mode.

A.

Standby power mode: Power is supplied only to the service processor and the cooling fans, and it is safe to power off the server from this mode.

Answers
B.

Power status LE

B.

Power status LE

Answers
C.

Green indicates that the server is in main power mode and can be safely powered off.

C.

Green indicates that the server is in main power mode and can be safely powered off.

Answers
D.

Graceful shutdown: Press and release the power button. The operating system performs a graceful shutdown, and the server goes to standby mode, which isindicated by an amber power status LED.

D.

Graceful shutdown: Press and release the power button. The operating system performs a graceful shutdown, and the server goes to standby mode, which isindicated by an amber power status LED.

Answers
E.

Disconnect the power cords from the power supplies in your server to completely power off the server.

E.

Disconnect the power cords from the power supplies in your server to completely power off the server.

Answers
F.

Only an emergency shutdown can be performed using the power button on the server front panel.

F.

Only an emergency shutdown can be performed using the power button on the server front panel.

Answers
G.

The Cisco UCS C-Series Rack-Mount Server has only one power mode.

G.

The Cisco UCS C-Series Rack-Mount Server has only one power mode.

Answers
Suggested answer: A, C, D

Which three components are hot swappable in a Cisco UCS Blade Server and Chassis? (Choose three.)

A.

Fabric Extender

A.

Fabric Extender

Answers
B.

Power supply

B.

Power supply

Answers
C.

Heat sink

C.

Heat sink

Answers
D.

SAS Hard Drive

D.

SAS Hard Drive

Answers
E.

2x8GB Kit DIMMs

E.

2x8GB Kit DIMMs

Answers
F.

Mezzanine card

F.

Mezzanine card

Answers
Suggested answer: A, B, D

Which five things should the administrator verify after performing maintenance or replacing a blade server? (Choose five.)

A.

blade server status

A.

blade server status

Answers
B.

hard drive status

B.

hard drive status

Answers
C.

host OS boot status

C.

host OS boot status

Answers
D.

CPU status

D.

CPU status

Answers
E.

mezzanine card status

E.

mezzanine card status

Answers
F.

memory DIMM status

F.

memory DIMM status

Answers
G.

fan and power status

G.

fan and power status

Answers
Suggested answer: A, B, D, E, F

Which two statements about DIMM replacement in Cisco UCS Servers are true? (Choose two.)

A.

In blade servers, DIMMs can be installed in either 1, 2, 4, or 8 DIMMs per channel.

A.

In blade servers, DIMMs can be installed in either 1, 2, 4, or 8 DIMMs per channel.

Answers
B.

Rack-mount and blade servers have memory fault LEDs that indicate which DIMM requires attention.

B.

Rack-mount and blade servers have memory fault LEDs that indicate which DIMM requires attention.

Answers
C.

In servers that require pairs of DIMMs, the pairs must be identical (manufacturer, size, part #, and so on).

C.

In servers that require pairs of DIMMs, the pairs must be identical (manufacturer, size, part #, and so on).

Answers
D.

If the memory in a server is not fully populated, you can install DIMMs in any open slot.

D.

If the memory in a server is not fully populated, you can install DIMMs in any open slot.

Answers
Suggested answer: A, C

Which three tools are necessary to console into a Cisco UCS C-Series Rack-Mount Server? (Choose three.)

A.

Cisco DB-9-to-RJ-45 console cable

A.

Cisco DB-9-to-RJ-45 console cable

Answers
B.

laptop

B.

laptop

Answers
C.

monitor

C.

monitor

Answers
D.

keyboard

D.

keyboard

Answers
E.

KVM dongle

E.

KVM dongle

Answers
F.

USB serial adapter

F.

USB serial adapter

Answers
Suggested answer: C, D, E

After installation or replacement of a Cisco UCS C-Series Rack-Mount Server, the host does not boot.

Which four options should be verified? (Choose four.)

A.

Verify the power source to the equipment.

A.

Verify the power source to the equipment.

Answers
B.

Check for loose HDD cables.

B.

Check for loose HDD cables.

Answers
C.

Reseat the DIMMs, CPU, and PCI cards.

C.

Reseat the DIMMs, CPU, and PCI cards.

Answers
D.

Verify that power supplies are receiving power.

D.

Verify that power supplies are receiving power.

Answers
E.

Reseat the mezzanine card connector.

E.

Reseat the mezzanine card connector.

Answers
F.

Check the CPU sockets for bent pins.

F.

Check the CPU sockets for bent pins.

Answers
G.

Check the Cisco IMC for fan faults.

G.

Check the Cisco IMC for fan faults.

Answers
Suggested answer: A, C, D, F

Which three firmware components does the Host Upgrade Utility upgrade? (Choose three.)

A.

Fabric Interconnect firmware

A.

Fabric Interconnect firmware

Answers
B.

LAN on Motherboard

B.

LAN on Motherboard

Answers
C.

Cisco UCS Manager

C.

Cisco UCS Manager

Answers
D.

CIMC

D.

CIMC

Answers
E.

System BIOS

E.

System BIOS

Answers
Suggested answer: B, D, E