A consultant is working to setup the network before starting the Foundation process.
How should the consultant complete this task?
Before deploying a new 3-node cluster, a consultant wants to know which VLAN ID to use during Foundation.
Where can the consultant find this information?
After an onsite cluster deployment, a consultant prepares the deliverables for a project closeout.
Which two data in the As-Built Guide require adjustment or might be missing completely? (Choose two.)
A consultant is reviewing a customers Pre-delivery Questionnaire.
The customer wants to deploy their cluster with ESXi as the hypervisor with vSphere Distributed Switch. The customer will be using Cisco Nexus 9k as their switch choice In the kick-off call, it is confirmed that the customer has a business requirement to use LACP in their environment.
What should the consultant ensure that the customer configures on the port-channel interface before deployment?
A consultant is preparing for a cluster deployment and evaluates portable Foundation.
Laptop configuration is as follows:
* CPU: 2.8 GHz Quad-Core Intel Core i7
* Memory: 4GB RAM
During the installation, the consultant encounters some errors and tries to troubleshoot.
What could prevent successful installation and Foundation usage?
After deployment of a Nutanix cluster, a customer has requested to validate the peak performance of the cluster.
Which tool can a consultant use to satisfy this request?
A consultant attempts to perform an LCM inventory after successfully creating the cluster, but is met with the following error:
LCM Exception [LcmExceptionHandler]: Could not find a module for entity with reference name nutanix.ncc.update
What is the most likely reason LCM inventory/update is failing?
During the knowledge transfer session, a consultant conducts a storage management demo. In the Creating a Storage Container workflow, the customer notices the Advertised Capacity parameter and asks for an explanation.
How should the consultant respond?
A customer's security team has a policy prohibiting a consultant's laptop from connecting within the corporate datacenter.
In which two ways should the consultant complete the customer deployment on the factory-prepared nodes? (Choose two.)
Refer to Exhibit:
A customer is preparing to expand a cluster with a consultant. The production cluster is comprised of one NX-3460-G7 and two NX-8235 G8 blocks. The running AOS version is 5.20.4.6 and Hypervisor version is ESXi 6.7 U3b. vCenter is also running a 6.7 version.
One NX-3235-G9 block will be added to that cluster (ESXI-NUTA-09 and ESXI-NUTA-10).
The consultant has verified Nutanix documentation and customer's As-Built guide:
* NX-3060-G7 and NX-8035-G8 are hybrid HCI nodes
* ESXi 6.7 U3b is unsupported for the new G9 hardware model
* AOS 5.20.X and ESXi 6 X are end of support
* NX-3060-G7 and NX-8035-G8 hypervisors can be upgraded to the latest ESXi supported version
What actions should be taken before beginning the cluster expansion?
Question