Nutanix NCSE-Core Practice Test - Questions Answers, Page 5
List of questions
Related questions
Prospective customer explains their current infrastructure and upcoming goals. They are a fastgrowing software company with approximately 3000 employees. Engineering accounts for approximately half of total staff and is behind on product releases.
This department has been building their own infrastructure using available hardware, SaaS offerings, and public cloud.
There's a new CIO attempting to gain control of existing and incoming information systems while supporting the agile environment responsible for their rapid innovation with a minimal staff. From this information, which two addressable pain points or gaps should be discerned?(Choose two)
A prospect provides the following details for sizing active working set based on their existing server virtualization environment:
Full backup reports:
January: 10TB
February: 11TB
March: 12TB
April: 13TB
May: 14TB
Average Read/Write Ratio - 75/25
When entering a Raw Input in Sizer, what should the SE use as the minimum amount of required SSD Storage?
Refer to the exhibit.
A prospect provides the data shown captured from their existing environment using RVTools. The prospect has additional historical CPU utilization data that indicates peak CPU utilization never exceeds 50% on either physical host.
Which vCPU:pCore ratio should be used in Sizer?
Refer to the exhibit.
Assuming a prospect is currently using Thick Provisioned virtual disk, at a minimum, which two tabs should be evaluated in an RVTools report to determine required resources for sizing? (Choose two.)
Refer to the exhibit.
***Exhibit is Missing***
Based on the sizing scenario, what level of resiliency can be inferred about the configuration?
Refer to the exhibit.
***Exhibit is Missing***
Based on the Sizing scenario, what level of resiliency can be inferred about the configuration?
Refer to the exhibit.
In Sizer, in which two ways can an SE accommodate a specific number of physical host-based software licenses that a customer has available for a project? (Choose two)
Refer to the exhibit.
Using the Sizing Options shown, which two configurations are valid when using Sizer in Automatic mode?(Choose two.)
AN SE determines that a POC is necessary to overcome competitive FUD in an opportunity with an Enterprise account evaluating several HCI solutions. The customer will evaluate three solutions in their datacenter simultaneously over the course of 4 days.
The customer schedules all necessary personnel to be available during this time.
Which two network planning items should the SE determine prior to allocation hardware for the POC? (Choose two)
An SE is in the discovery phase with a new customer. The customer is frustrated with the lack of transparency into their environment with the current monitoring tools. The customer has difficulty correlating the degradation of the end user experience with point-in-time events.
Which Prism feature should the SE demonstrate to show relevant value?
Question