ExamGecko
Home Home / Nutanix / NCSE-Core

Nutanix NCSE-Core Practice Test - Questions Answers, Page 5

Question list
Search
Search

List of questions

Search

Related questions











Prospective customer explains their current infrastructure and upcoming goals. They are a fastgrowing software company with approximately 3000 employees. Engineering accounts for approximately half of total staff and is behind on product releases.

This department has been building their own infrastructure using available hardware, SaaS offerings, and public cloud.

There's a new CIO attempting to gain control of existing and incoming information systems while supporting the agile environment responsible for their rapid innovation with a minimal staff. From this information, which two addressable pain points or gaps should be discerned?(Choose two)

A.
System availability issues
A.
System availability issues
Answers
B.
SQL Server performance issues
B.
SQL Server performance issues
Answers
C.
""Shadow IT"" that increases the risk of security breaches and brand damage
C.
""Shadow IT"" that increases the risk of security breaches and brand damage
Answers
D.
Slow response time from the infrastructure group (SLAs) that could result in product release delays
D.
Slow response time from the infrastructure group (SLAs) that could result in product release delays
Answers
E.
significantly degraded end user experience
E.
significantly degraded end user experience
Answers
Suggested answer: A, D

A prospect provides the following details for sizing active working set based on their existing server virtualization environment:

Full backup reports:

January: 10TB

February: 11TB

March: 12TB

April: 13TB

May: 14TB

Average Read/Write Ratio - 75/25

When entering a Raw Input in Sizer, what should the SE use as the minimum amount of required SSD Storage?

A.
1.5TB
A.
1.5TB
Answers
B.
3TB
B.
3TB
Answers
C.
4.5TB
C.
4.5TB
Answers
D.
6TB
D.
6TB
Answers
Suggested answer: B

Refer to the exhibit.

A prospect provides the data shown captured from their existing environment using RVTools. The prospect has additional historical CPU utilization data that indicates peak CPU utilization never exceeds 50% on either physical host.

Which vCPU:pCore ratio should be used in Sizer?

A.
2:1
A.
2:1
Answers
B.
3:1
B.
3:1
Answers
C.
4:1
C.
4:1
Answers
D.
5:1
D.
5:1
Answers
Suggested answer: C

Refer to the exhibit.

Assuming a prospect is currently using Thick Provisioned virtual disk, at a minimum, which two tabs should be evaluated in an RVTools report to determine required resources for sizing? (Choose two.)

A.
vInfo
A.
vInfo
Answers
B.
vNetwork
B.
vNetwork
Answers
C.
vPartition
C.
vPartition
Answers
D.
vCluster
D.
vCluster
Answers
E.
vDisk
E.
vDisk
Answers
Suggested answer: A, C

Refer to the exhibit.

***Exhibit is Missing***

Based on the sizing scenario, what level of resiliency can be inferred about the configuration?

A.
FTT1
A.
FTT1
Answers
B.
N+0
B.
N+0
Answers
C.
N+1
C.
N+1
Answers
D.
N+2
D.
N+2
Answers
Suggested answer: D

Refer to the exhibit.

***Exhibit is Missing***

Based on the Sizing scenario, what level of resiliency can be inferred about the configuration?

A.
RF3
A.
RF3
Answers
B.
N+1
B.
N+1
Answers
C.
N+0
C.
N+0
Answers
D.
N+2
D.
N+2
Answers
Suggested answer: C

Refer to the exhibit.

In Sizer, in which two ways can an SE accommodate a specific number of physical host-based software licenses that a customer has available for a project? (Choose two)

A.
A
A.
A
Answers
B.
B
B.
B
Answers
C.
C
C.
C
Answers
D.
D
D.
D
Answers
Suggested answer: B, D

Refer to the exhibit.

Using the Sizing Options shown, which two configurations are valid when using Sizer in Automatic mode?(Choose two.)

A.
6x NX-3060-G6 (6x 1920GB SSDs per node)
A.
6x NX-3060-G6 (6x 1920GB SSDs per node)
Answers
B.
4x NX-1065-G5 (3x 3840GB SSDs per node) + 4x NX-6035CG5(6x3840GB SSD per node)
B.
4x NX-1065-G5 (3x 3840GB SSDs per node) + 4x NX-6035CG5(6x3840GB SSD per node)
Answers
C.
6x NX-8150-G5 (4x 1920GB SSD + 20x 2TB HDD per node)
C.
6x NX-8150-G5 (4x 1920GB SSD + 20x 2TB HDD per node)
Answers
D.
3x NX-3060-G5 (2x 1920GB SSD per node) + 3x NX-3055G (4x960GBSSD per node)
D.
3x NX-3060-G5 (2x 1920GB SSD per node) + 3x NX-3055G (4x960GBSSD per node)
Answers
E.
6x NX-165S-G5 (3x 48GB SSD per node)
E.
6x NX-165S-G5 (3x 48GB SSD per node)
Answers
Suggested answer: A, D

AN SE determines that a POC is necessary to overcome competitive FUD in an opportunity with an Enterprise account evaluating several HCI solutions. The customer will evaluate three solutions in their datacenter simultaneously over the course of 4 days.

The customer schedules all necessary personnel to be available during this time.

Which two network planning items should the SE determine prior to allocation hardware for the POC? (Choose two)

A.
VLAN tags
A.
VLAN tags
Answers
B.
CVM and hypervisor IP address
B.
CVM and hypervisor IP address
Answers
C.
TOR switch redundancy configuration
C.
TOR switch redundancy configuration
Answers
D.
Switch port type
D.
Switch port type
Answers
E.
Source and number of cables
E.
Source and number of cables
Answers
Suggested answer: D, E

An SE is in the discovery phase with a new customer. The customer is frustrated with the lack of transparency into their environment with the current monitoring tools. The customer has difficulty correlating the degradation of the end user experience with point-in-time events.

Which Prism feature should the SE demonstrate to show relevant value?

A.
Analysis page with custom charts and event reporting
A.
Analysis page with custom charts and event reporting
Answers
B.
A specific virtual machine's Performance Summary
B.
A specific virtual machine's Performance Summary
Answers
C.
Event tab on the Alerts page
C.
Event tab on the Alerts page
Answers
D.
A specific virtual machine's virtual disk Additional Stats
D.
A specific virtual machine's virtual disk Additional Stats
Answers
Suggested answer: A
Total 198 questions
Go to page: of 20