C_TS422_2023: SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing
SAP
Exam Number: C_TS422_2023
Exam Name: SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing
Length of test: 180 mis
Exam Format: Multiple-choice, Drag and Drop, and HOTSPOT questions.
Exam Language: English
Number of questions in the actual exam: 80 questions
Passing Score: 68%
Topics Covered: Advanced Planning in SAP S/4HANA: 11% - 20%, Production Orders in SAP S/4HANA: 11% - 20%, Master Data in SAP S/4HANA: 11% - 20%, Process Orders in SAP S/4HANA: ≤ 10%, Material Requirements Planning in SAP S/4HANA: ≤ 10%, Lean Manufacturing in SAP S/4HANA: ≤ 10%, Capacity Planning in SAP S/4HANA: ≤ 10%, Demand Management in SAP S/4HANA: ≤ 10%, Introduction to SAP S/4HANA Production Planning: ≤ 10%.
This study guide should help you understand what to expect on the C_TS422_2023 exam and includes a summary of the topics the exam might cover and links to additional resources. The information and materials in this document should help you focus your studies as you prepare for the exam.
Related questions
What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?
MRP creates a dependent requirement.
A sales order is delivered.
MRP creates a planned order.
A sales order is created.
What are the advantages of collective orders? Note: There are 2 correct answers to this question.
To perform availability checks across the entire collective order
To coordinate orders in the planning board for a collective order
To show the flow of batches across the entire collective order
To post confirmations for the entire collective order
You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.
Convert a purchase requisition
Create without material
Create by order release
Create in Kanban process
During production order creation several valid production versions are found. How does the system choose the production version?
Alphanumeric or quota arrangement
Planned order or material number
Validity period or sales order
Lot size or material cost
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.
Production orders
Planned orders (firmed)
Planned orders (unfirmed)
ATP quantities
Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.
You can use trigger points to automatically create rework orders via confirmations.
You can use mass processing to set production orders to technically complete.
You can use the production scheduling profile to automatically set orders to technically complete.
You can use mass processing to read PP master data for production orders.
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
Which of the following are features of the clean core dashboard? Note: There are 2 correct answers to this question.
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.
In which storage location is the BOM required?
Is the material type allowed in the BOM?
Which base unit of measure does the material have?
What status does the BOM have?
What options does a planner have in the planning table for repetitive manufacturing? Note: There are 2 correct answers to this question.
Question