Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.
Production orders
Planned orders (firmed)
Planned orders (unfirmed)
ATP quantities
In your plant MRP is activated.
Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.
Use a specific MRP list.
Use a specific material status.
Use a specific material group.
Use a specific MRP type.
In documentation for MRP in Advanced Planning you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?
MRP assigns the capacity requirements automatically after the last scheduled operation for each work center.
MRP creates the capacity requirements without considering existing load on the work centers.
MRP creates the capacity requirements at the earliest possible time.
MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.
Which information is required when you create a product master in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.
Base unit of measure
Industry sector
Selection screen for views
Product type
What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.
Manufacturing date
BOM header status
BOM component status
Lot size
What does the material type influence?
Note: There are 2 correct answers to this question.
Which document types class categories are allowed
Which plantspecific plantindependent statuses are allowed
Which material master screens appear in which sequence
Whether the material is produced inhouse procured externally or both
Which stard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
Variablesize item
Work item
Preliminary item
WBS item
Why would you use phantom assemblies?
Note: There are 3 correct answers to this question.
To simplify the structure of bills of material
To reduce the number of changes required in bills of material
To reduce the number of material masters
To make the assignment of components easier
To increase the number of planning levels
What are the key features of using a low level code? Note: There are 2 correct answers to this question.
To determine the priority of alternative components inside ATP
To determine how costs are rolled up by product costing
To determine the sequence in which materials are planned in MRP
To determine the use of subitems inside material BOM (bill of material)
You have maintained the parameters for simple discontinuation in the material master of a component.
Which business process will be affected if the available stock is zero the discontinuation date is in the past?
Back flushing
Kanban
Material requirements planning
Production order release