How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.

By capacity planning

By capacity planning

By order confirmation

By order confirmation

By order release

By order release

By mass processing

By mass processing

Suggested answer: C, D
asked 31/10/2024
Updesh Kumar
37 questions

Question 12

Report
Export
Collapse

For a production version to be valid consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

The deletion flag must NOT be set for the bill of material (BOM) or the routing.

The deletion flag must NOT be set for the bill of material (BOM) or the routing.

The consistency check must be performed.

The consistency check must be performed.

The assigned routing bill of material (BOM) must be valid in the entire validity period.

The assigned routing bill of material (BOM) must be valid in the entire validity period.

The assigned routing bill of material (BOM) must have the same validity period.

The assigned routing bill of material (BOM) must have the same validity period.

The lot size range must be within the lot size range of the assigned routing.

The lot size range must be within the lot size range of the assigned routing.

Suggested answer: A, C, E
asked 31/10/2024
Rekik Tesfaye
37 questions

Question 13

Report
Export
Collapse

You want to use capacity availability checks for production orders. Which settings have to be made for this?

Note: There are 2 correct answers to this question.

The Relevant for Finite Scheduling indicator must be set.

The Relevant for Finite Scheduling indicator must be set.

The scope of check must be defined in Customizing.

The scope of check must be defined in Customizing.

A checking rule must be assigned to the work centers.

A checking rule must be assigned to the work centers.

An overall profile must be assigned in the checking control.

An overall profile must be assigned in the checking control.

Suggested answer: A, D
asked 31/10/2024
Shane Cook
33 questions

Question 14

Report
Export
Collapse

Which business processes are affected by settings in the order type dependent parameters? Note: There are 2 correct answers to this question.

Schedule production orders.

Schedule production orders.

Check material availability.

Check material availability.

Select master data.

Select master data.

Define integration with cost accounting.

Define integration with cost accounting.

Suggested answer: C, D
asked 31/10/2024
Rio Ordonez
51 questions

Question 15

Report
Export
Collapse

For production orders cost object controlling (COC) can be carried out on an order related or product related basis. Which of the following do you have to consider?

Note: There are 2 correct answers to this question.

Productrelated COC is used in manufacturing for coproducts.

Productrelated COC is used in manufacturing for coproducts.

In productrelated COC all costs are debited credited to a product cost collector.

In productrelated COC all costs are debited credited to a product cost collector.

In orderrelated COC individual production orders do NOT have cost segments.

In orderrelated COC individual production orders do NOT have cost segments.

Orderrelated COC is beneficial in a flexible production environment.

Orderrelated COC is beneficial in a flexible production environment.

Suggested answer: B, D
asked 31/10/2024
Vo Quoc Bao
35 questions

Question 16

Report
Export
Collapse

Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.

You can use trigger points to automatically create rework orders via confirmations.

You can use trigger points to automatically create rework orders via confirmations.

You can use mass processing to set production orders to technically complete.

You can use mass processing to set production orders to technically complete.

You can use the production scheduling profile to automatically set orders to technically complete.

You can use the production scheduling profile to automatically set orders to technically complete.

You can use mass processing to read PP master data for production orders.

You can use mass processing to read PP master data for production orders.

Suggested answer: A, B
asked 31/10/2024
Daniela Stojanovska
36 questions

Question 17

Report
Export
Collapse

You want to create a production order. What methods can you use?

Note: There are 2 correct answers to this question.

Convert a purchase requisition

Convert a purchase requisition

Create without material

Create without material

Create by order release

Create by order release

Create in Kanban process

Create in Kanban process

Suggested answer: B, D
asked 31/10/2024
Keona Campbell
34 questions

Question 18

Report
Export
Collapse

What are the advantages of collective orders? Note: There are 2 correct answers to this question.

To perform availability checks across the entire collective order

To perform availability checks across the entire collective order

To coordinate orders in the planning board for a collective order

To coordinate orders in the planning board for a collective order

To show the flow of batches across the entire collective order

To show the flow of batches across the entire collective order

To post confirmations for the entire collective order

To post confirmations for the entire collective order

Suggested answer: A, D
asked 31/10/2024
Arkadiusz Skopinski
40 questions

Question 19

Report
Export
Collapse

What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

MRP creates a dependent requirement.

MRP creates a dependent requirement.

A sales order is delivered.

A sales order is delivered.

MRP creates a planned order.

MRP creates a planned order.

A sales order is created.

A sales order is created.

Suggested answer: D
asked 31/10/2024
Elizabeth Holland
41 questions

Question 20

Report
Export
Collapse

Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

Work center

Work center

Material master

Material master

Routing

Routing

Production version

Production version

Suggested answer: A, C