ExamGecko
Home Home / SAP / C_TS422_2023

SAP C_TS422_2023 Practice Test - Questions Answers, Page 2

Question list
Search
Search

List of questions

Search

Related questions











How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.

A.

By capacity planning

A.

By capacity planning

Answers
B.

By order confirmation

B.

By order confirmation

Answers
C.

By order release

C.

By order release

Answers
D.

By mass processing

D.

By mass processing

Answers
Suggested answer: C, D

For a production version to be valid consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

A.

The deletion flag must NOT be set for the bill of material (BOM) or the routing.

A.

The deletion flag must NOT be set for the bill of material (BOM) or the routing.

Answers
B.

The consistency check must be performed.

B.

The consistency check must be performed.

Answers
C.

The assigned routing bill of material (BOM) must be valid in the entire validity period.

C.

The assigned routing bill of material (BOM) must be valid in the entire validity period.

Answers
D.

The assigned routing bill of material (BOM) must have the same validity period.

D.

The assigned routing bill of material (BOM) must have the same validity period.

Answers
E.

The lot size range must be within the lot size range of the assigned routing.

E.

The lot size range must be within the lot size range of the assigned routing.

Answers
Suggested answer: A, C, E

You want to use capacity availability checks for production orders. Which settings have to be made for this?

Note: There are 2 correct answers to this question.

A.

The Relevant for Finite Scheduling indicator must be set.

A.

The Relevant for Finite Scheduling indicator must be set.

Answers
B.

The scope of check must be defined in Customizing.

B.

The scope of check must be defined in Customizing.

Answers
C.

A checking rule must be assigned to the work centers.

C.

A checking rule must be assigned to the work centers.

Answers
D.

An overall profile must be assigned in the checking control.

D.

An overall profile must be assigned in the checking control.

Answers
Suggested answer: A, D

Which business processes are affected by settings in the order type dependent parameters? Note: There are 2 correct answers to this question.

A.

Schedule production orders.

A.

Schedule production orders.

Answers
B.

Check material availability.

B.

Check material availability.

Answers
C.

Select master data.

C.

Select master data.

Answers
D.

Define integration with cost accounting.

D.

Define integration with cost accounting.

Answers
Suggested answer: C, D

For production orders cost object controlling (COC) can be carried out on an order related or product related basis. Which of the following do you have to consider?

Note: There are 2 correct answers to this question.

A.

Productrelated COC is used in manufacturing for coproducts.

A.

Productrelated COC is used in manufacturing for coproducts.

Answers
B.

In productrelated COC all costs are debited credited to a product cost collector.

B.

In productrelated COC all costs are debited credited to a product cost collector.

Answers
C.

In orderrelated COC individual production orders do NOT have cost segments.

C.

In orderrelated COC individual production orders do NOT have cost segments.

Answers
D.

Orderrelated COC is beneficial in a flexible production environment.

D.

Orderrelated COC is beneficial in a flexible production environment.

Answers
Suggested answer: B, D

Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.

A.

You can use trigger points to automatically create rework orders via confirmations.

A.

You can use trigger points to automatically create rework orders via confirmations.

Answers
B.

You can use mass processing to set production orders to technically complete.

B.

You can use mass processing to set production orders to technically complete.

Answers
C.

You can use the production scheduling profile to automatically set orders to technically complete.

C.

You can use the production scheduling profile to automatically set orders to technically complete.

Answers
D.

You can use mass processing to read PP master data for production orders.

D.

You can use mass processing to read PP master data for production orders.

Answers
Suggested answer: A, B

You want to create a production order. What methods can you use?

Note: There are 2 correct answers to this question.

A.

Convert a purchase requisition

A.

Convert a purchase requisition

Answers
B.

Create without material

B.

Create without material

Answers
C.

Create by order release

C.

Create by order release

Answers
D.

Create in Kanban process

D.

Create in Kanban process

Answers
Suggested answer: B, D

What are the advantages of collective orders? Note: There are 2 correct answers to this question.

A.

To perform availability checks across the entire collective order

A.

To perform availability checks across the entire collective order

Answers
B.

To coordinate orders in the planning board for a collective order

B.

To coordinate orders in the planning board for a collective order

Answers
C.

To show the flow of batches across the entire collective order

C.

To show the flow of batches across the entire collective order

Answers
D.

To post confirmations for the entire collective order

D.

To post confirmations for the entire collective order

Answers
Suggested answer: A, D

What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

A.

MRP creates a dependent requirement.

A.

MRP creates a dependent requirement.

Answers
B.

A sales order is delivered.

B.

A sales order is delivered.

Answers
C.

MRP creates a planned order.

C.

MRP creates a planned order.

Answers
D.

A sales order is created.

D.

A sales order is created.

Answers
Suggested answer: D

Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

A.

Work center

A.

Work center

Answers
B.

Material master

B.

Material master

Answers
C.

Routing

C.

Routing

Answers
D.

Production version

D.

Production version

Answers
Suggested answer: A, C
Total 79 questions
Go to page: of 8