Question 11
 
                            
                            
                                How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.
By capacity planning
By order confirmation
By order release
By mass processing
Question 12
 
                            
                            
                                For a production version to be valid consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
The deletion flag must NOT be set for the bill of material (BOM) or the routing.
The consistency check must be performed.
The assigned routing bill of material (BOM) must be valid in the entire validity period.
The assigned routing bill of material (BOM) must have the same validity period.
The lot size range must be within the lot size range of the assigned routing.
Question 13
 
                            
                            
                                You want to use capacity availability checks for production orders. Which settings have to be made for this?
Note: There are 2 correct answers to this question.
The Relevant for Finite Scheduling indicator must be set.
The scope of check must be defined in Customizing.
A checking rule must be assigned to the work centers.
An overall profile must be assigned in the checking control.
Question 14
 
                            
                            
                                Which business processes are affected by settings in the order type dependent parameters? Note: There are 2 correct answers to this question.
Schedule production orders.
Check material availability.
Select master data.
Define integration with cost accounting.
Question 15
 
                            
                            
                                For production orders cost object controlling (COC) can be carried out on an order related or product related basis. Which of the following do you have to consider?
Note: There are 2 correct answers to this question.
Question 16
 
                            
                            
                                Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.
Question 17
 
                            
                            
                                You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.
Question 18
 
                            
                            
                                What are the advantages of collective orders? Note: There are 2 correct answers to this question.
Question 19
 
                            
                            
                                What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?
Question 20
 
                            
                            
                                Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.
 