HP HPE0-S60 Practice Test - Questions Answers, Page 6
List of questions
Related questions
Your customer has the following HPE Synergy setup:
- 15 HPE Synergy 12000 frames with 50Gb connectivity to each server port
- 2 HPE Composer 2 modules
- 15 HPE D3940 Storage Modules, one per frame
- 2 HPE 12Gb SAS switches per frame
Which statement about this setup is true?
HOTSPOT
An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Click the parameter that the customer should configure within an uplink set to meet this requirement
HOTSPOT
Click the area within the iLO management interface that will allow you to access workload Advisor.
DRAG DROP
You need to setup HPE Synergy frames after hardware components are discovered within HPE OneView.
Put the steps to achieve this goal into the coned order in the answer area on the right.
HOTSPOT
Click the option that will allow you to change the ESXI image used In an OS Deployment Plan.
DRAG DROP
Your customer plans to use HPE OneView for VMware vCenter Server to deploy ESXi systems. They created a server profile template that they want to use in HPE OneView.
Put the steps required to configure HPE OneView for VMware vCenter Server on the left into their correct order on the right.
HOTSPOT
After deploying HPE Superdome Flex 280 you need to check Core Analysis Engine (CAE) Log.
Click the appropriate section in the HPE Superdome Flex 280 management interface that will allow you to complete this task.
DRAG DROP
Match each HPE Synergy logical component with the definition.
HOTSPOT
Click the drop-down menu that will allow you to define the location of the master modules within the logical interconnect group.
HOTSPOT
Your customer is implementing an HPE Synergy solution based on three frames.
Click each of the ports that can be used to connect satellite modules.
Question