ExamGecko
Home Home / HP / HPE0-S60

HP HPE0-S60 Practice Test - Questions Answers, Page 7

Question list
Search
Search

List of questions

Search

Related questions











DRAG DROP

Match HPE SimpliVity team with the definition.


Question 61
Correct answer: Question 61

DRAG DROP

Match each HPE OneView network type with its definition.


Question 62
Correct answer: Question 62

Your customer uses HPE OneView to manage their HPE Synergy environment. They plan to use it to manage a new set equipment that includes.

- 20 HPE ProLiant DL365 Gen10 Plus servers

- 20 HPE ProLiant DL380 Gen10 Plus servers

- 5 HPE Primera 650

- 5 HPE MSA 2062 Storage Array

Which statements about now OneView will work with this new equipment are true? (Select two)

A.
HPE ProLiant DL365 Gen10 Plus servers are not supported in HPE OneView
A.
HPE ProLiant DL365 Gen10 Plus servers are not supported in HPE OneView
Answers
B.
HPE MSA 2062 Storage Array is not supported in HPE OneView
B.
HPE MSA 2062 Storage Array is not supported in HPE OneView
Answers
C.
HPE OneView replaces array management tools for both types of array
C.
HPE OneView replaces array management tools for both types of array
Answers
D.
HPE ProLiant DL380 Gen10 Plus servers have an HPE OneView license included
D.
HPE ProLiant DL380 Gen10 Plus servers have an HPE OneView license included
Answers
E.
HPE Primera 650 can be managed using HPE OneView.
E.
HPE Primera 650 can be managed using HPE OneView.
Answers
Suggested answer: D

Your customer plans to expand an existing nPar based on a single HPE Superdome Flex chasWhich statement about workload availability during expansion is true?

A.
Powered nPar can be expanded only if HPE Superdome Flex 280 is used
A.
Powered nPar can be expanded only if HPE Superdome Flex 280 is used
Answers
B.
Online expansion is available only if RMC is used for management.
B.
Online expansion is available only if RMC is used for management.
Answers
C.
HPE Superdome Flex does not support expansion of powered on nPars
C.
HPE Superdome Flex does not support expansion of powered on nPars
Answers
D.
Powered nPar can be expanded if it does not use HPE Persistent Memory
D.
Powered nPar can be expanded if it does not use HPE Persistent Memory
Answers
Suggested answer: A

DRAG DROP

After HPE Superdome Flex deployment and nPar setup, you need to verify health status of HPE Superdome Flex components.

Put the steps on the left into the coned order on the right to perform this task.


Question 65
Correct answer: Question 65

Your customer manages an HPE Synergy platform using HPE OneView 5.6. To leverage new functionalities, the customer wants to update HPE OneView to version 61

Which statement about this update process is true?

A.
To update to 6,1, the customer has to first update to 6 0, which is a milestone edition.
A.
To update to 6,1, the customer has to first update to 6 0, which is a milestone edition.
Answers
B.
The customer can update directly to 6,1, but HPE OneView downtime will be longer.
B.
The customer can update directly to 6,1, but HPE OneView downtime will be longer.
Answers
C.
Before updating to 6,1, customer should increase memory size on the HPE Composer.
C.
Before updating to 6,1, customer should increase memory size on the HPE Composer.
Answers
D.
The customer must check the HPE Composer version, as 61 is supported only with HPE Composer2.
D.
The customer must check the HPE Composer version, as 61 is supported only with HPE Composer2.
Answers
Suggested answer: D

DRAG DROP

Match HPE Superdome Flex system with its specific feature.


Question 67
Correct answer: Question 67

Your customer has a logical enclosure configured using a angle HPE Synergy frame with the following configuration

- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy

- two HPE Synergy Virtual Connect SE 32Gb FC Modules -12 HPE Synergy 480 Gen10 Plus compute nodes with appropriate mezzanine cards

They plan to add a new HPE Synergy frame to an existing logical enclosure with the following configuration

- two HPE Synergy Virtual Connect SE 32Gb FC Modules

- two HPE Synergy 20Gb interconnect Link Modules

- Eight HPE Synergy 480 Gen 10 Plus compute nodes with appropriate mezzanine cards

Which statement about the planned configuration change is true?

A.
Four compute modules must be moved to the second frame to balance the configuration
A.
Four compute modules must be moved to the second frame to balance the configuration
Answers
B.
The two HPE Synergy 20Gb interconnect Link Modules must be replace with the 50Gb option
B.
The two HPE Synergy 20Gb interconnect Link Modules must be replace with the 50Gb option
Answers
C.
A license for an extended logical enclosure must be added to HPE OneView through GUI
C.
A license for an extended logical enclosure must be added to HPE OneView through GUI
Answers
D.
The HPE Synergy virtual Connect SE 32Gb FC Modules from both frames should be stacked
D.
The HPE Synergy virtual Connect SE 32Gb FC Modules from both frames should be stacked
Answers
Suggested answer: D

Your customer plans to manage HPE Primera using HPE Oneview

Which storage management tasks can be completed using HPE OneView for this environment?

A.
CPG management
A.
CPG management
Answers
B.
Volume provisioning
B.
Volume provisioning
Answers
C.
Cache management
C.
Cache management
Answers
D.
Replication setup
D.
Replication setup
Answers
Suggested answer: B

The proposal consists of.

- 3 HPE Synergy 12000 frames

- 6 HPE Composer 2 modules

- 2 HPE Virtual Connect SE 100 GO F32 Module

- 4 HPE Synergy 50 GO interconnect Link Module

Which statements about this proposed design are true? (Select two.)

A.
The selected interconnect modules do not provide the requested WWN virtualization
A.
The selected interconnect modules do not provide the requested WWN virtualization
Answers
B.
HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100 GO F32 modules
B.
HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100 GO F32 modules
Answers
C.
The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules
C.
The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules
Answers
D.
FC upgrade licenses for HPE Virtual Connect SE 100 GbF32 Module must be added
D.
FC upgrade licenses for HPE Virtual Connect SE 100 GbF32 Module must be added
Answers
E.
Remove 4 HPE Composer 2 modules from the design, as they are not required
E.
Remove 4 HPE Composer 2 modules from the design, as they are not required
Answers
Suggested answer: B, D
Total 78 questions
Go to page: of 8