ExamGecko
Home / HP / HPE6-A73 / List of questions
Ask Question

HP HPE6-A73 Practice Test - Questions Answers, Page 13

Add to Whishlist

List of questions

Question 121

Report Export Collapse

Examine the network exhibit:

HP HPE6-A73 image Question 121 14690 09162024180712000000

Examine Rome r4's partial OSPF configuration: router OSPF 1

Area 0

exit interface vlan 100

ip ospf area 0

exit interface vlan 40

ip ospf area 0

exit interface 1/1/1

vlan access 100

mtu9000

Ip ospt hello-Interval 1

Ip ospt dead-Interval 4

ip ospf authentication simple-text

ip ospf authentication-key key123

When executing the 'show ip ospf neighbors' command, Router 4 is in a FULL state with Router 3 and Router 2, but a 2-WAY state with Route3. What is causing the 2-WAY state with Router 1?

Become a Premium Member for full access
  Unlock Premium Member

Question 122

Report Export Collapse

Which does VOQ implement that is different from most typical campus switches?

Become a Premium Member for full access
  Unlock Premium Member

Question 123

Report Export Collapse

An administrator will be deploying HPE Aruba Networking Switch Multi-Edit Software to manage an Aruba solution. What does Switch Multi-Edit Software support?

Become a Premium Member for full access
  Unlock Premium Member

Question 124

Report Export Collapse

How does an administrator install a script and create an agent and actions for the Network Analysis Engine running on AOS-CX switches?

Become a Premium Member for full access
  Unlock Premium Member

Question 125

Report Export Collapse

Examine the configuration of Core-1 and Core-2. AOS-CX switches configured as a VSX stack:

Core1: Interlace lag 256

no shutdown

no routing

vlan trunk allowed all

lacp mode active Interface 1/1/46

no shutdown

lag 256 Interface 1/1/47

no shutdown

lag 256

VSX

Inter-switch-link lag 256

vsx-sync vsx-global

exit

Cofe2: interlace lag 250

no shutdown

no routing

vlan trunk allowed all

lacp mode active

Interlace 1/1/46

no shutdown

lag 256 Interface 1/1/47

no shutdown

lag 256 vsx

inter-switch-link lag 256

exit

When using the 'show vsx status' command, the two switches fall to connect and successfully synchronize. What should the administrator do to fix this issue?

Become a Premium Member for full access
  Unlock Premium Member

Question 126

Report Export Collapse

An access layer AOS-CX has no OoS configuration on it. The switch receives an 802.1Q tagged VoIP frame on a port. The frame has an 802.1p value of 6. The IP header has a DSCP value of EF46 How will the switch forward this frame?

Become a Premium Member for full access
  Unlock Premium Member

Question 127

Report Export Collapse

An administrate is managing a VSX pair of AOS-CX switches. The administrator configures the following on the secondary switch:

secondary (config)# vlan 100

secondary (conflg. vlan-100) # description BBB

Currently VLAN 100 does not exist on the primary switch. The administrator then accesses the primary switch and configures the following:

Primary(config) vlan 100 primary(config-v1an-100) # description AAA

What Is correct regarding the results of this configuration?

Become a Premium Member for full access
  Unlock Premium Member
Total 127 questions
Go to page: of 13

Related questions