Question 21

When a process has proven itself to function at a Six Sigma level this means there are less than ________ defects per million opportunities.
Question 22

Six Sigma refers to a process whose output has at least 95% of its data points within 6 Standard Deviations from the Mean.
Question 23

Training cost is $3,000 and a project required an initial investment of $12,000. If the project yields monthly savings of $1,800 beginning after 3 months, what is the payback period in months (before money costs and taxes)?
Question 24

The ROI for a project is a measurement metric that stands for Return on Investment and is one of the methods used to measure the success of a Lean Six Sigma project.
Question 25

The DMAIC approach to problem solving stands for Define, __________, Analyze, Improve and Control.
Question 26

Voice of the Customer is a Lean Six Sigma technique to determine the ___________ attributes of a product or service.
Question 27

Benefits and working conditions would be primarily the concern of which of the following?
Question 28

In the expression Y = f(Xn) Y, the output, is the ___________ variable and Xn, the inputs, are the __________ variables.
Question 29

As a Belt created a Process Map he realized there were multiple departments involved in this process so he added a feature to the map called ______________.
Question 30

As we conceive and define a LSS project one of the overriding things we hope to accomplish is to reduce the _____________________.