A Monitoring Plan put into place at the conclusion of a project will provide for adequate systems with key metric readouts indicating out-of-spec conditions.
When a process has proven itself to function at a Six Sigma level this means there are less than 3.4 defects per ___________ opportunities.
Six Sigma refers to a process whose output has 100% of its data points within 8 Standard Deviations from the Mean.
Training cost $2,500 and a project required an initial investment of $23,500. If the project yields monthly savings of $2,500 beginning after 4 months, what is the payback period in months (before money costs and taxes)?
The ROI for a project is a measurement metric that stands for _____________________ and is one of the methods used to measure the success of a Lean Six Sigma project.
The DMAIC approach to problem solving stands for Define, __________, Analyze, Improve and Control.
Voice of the Business is a Lean Six Sigma technique to determine the needs and wants of the ______________ of the business.
Benefits and working conditions would be primarily the concern of which of the following?
Y, the output of a process, is the ______________ variable while Xn, the various inputs to a process, are the _____________ variables.
When we assess the Voice of the Customer we are attempting to determine the gaps in our processes between ''what is'' and __________________.