Question 111

The Control Plan is created following the finalization of the Measure Phase and can be closed when?
Question 112

Systems and structures are the basis for allowing people to change their behaviors permanently and are accomplished through which of the following?
Question 113

To reduce the people or operator introduced defects into a process it is best if a Belt can design and implement a means of ________________ into the process.
Question 114

Upon completion of a project a Belt must complete the Documentation Plan then transfer responsibility for this to the ____________________.
Question 115

A ______________ is a graphical presentation of sample data that shows the number of times that a data point is a specific number.
Question 116

A tool we use to identify possible failures (defects) in our process and the impact they may have is the _________________.
Question 117

Lean Principles defines for us seven specific areas where ________ typically exists in our processes.
Question 118

It is recommended that when beginning a 5S program it be started in a pilot work area for learning and demonstration purposes then it is expended throughout the plant.
Question 119

As part of a Visual Factory plan _____________ are created and utilized to identify areas in need of cleaning and organization.
Question 120

One of the 5S approaches to eliminating waste is to organize all tools, information and inventory utilized at a workstation in such a manner that the operator knows exactly where things are when needed. This 5S tool is called __________________.